Influence of process bus on performance of power system protection

被引:6
作者
Melo, Andre Felipe Silva [1 ]
Netto, Ulisses Chemin [1 ]
da Silva, Jean Carlos Cardozo [2 ]
Dreyer, Uilian Jose [1 ]
机构
[1] Grad Program Energy Syst, Av 7,Setembro 3165, BR-80230901 Curitiba, Parana, Brazil
[2] Grad Program Elect & Comp Engn, Av 7,Setembro 3165, BR-80230901 Curitiba, Parana, Brazil
关键词
Process bus; IEC; 61850-9-2; 61850-9-2LE; 61869-9; Protection relays; Power system measurements and protection;
D O I
10.1016/j.epsr.2021.107491
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The development of substation operations under open standards has ensured interoperability among technology manufacturers and has led to system management evolution. Implementing a Process Bus (PB) and its related technologies represents the future of power systems protection. The release of the IEC61850-9-2 sampled values protocol has allowed the replacement of the conventional measurement method by an ethernet-based system at substation yards. This study focuses on the PB implementation effects such as the trip time delay and possible time shift over the protection system performance. The paper points out aspects that should be considered through the engineering process and design, considering the two PB standards, IEC61850-9-2LE and IEC61869-9. A test architecture was composed of a conventional relay, and two PB relays synchronized using the IEEE-1588Precision Time Protocol (PTP). Four tests were carried out, including a software simulation and field-collection data. The two PB standards presented similar results during the tests. The relay signal resampling results in time shifts that should be properly compensated, and the digitalization delays found can occasionally add more than 9 ms in the final trip time and must be considered in protection studies prior to implementation. Otherwise, it can significantly impact on the project of the power system.
引用
收藏
页数:8
相关论文
共 27 条
  • [11] Hong SY, 2000, 2000 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS I-III, PROCEEDINGS, P927, DOI 10.1109/ICPST.2000.897145
  • [12] I. E. Comission, 2011, 61850922011AMD12020
  • [13] I.E. Commission, 2013, 618505 IEC
  • [14] IEC 61869-9, 2016, 618699 IEC
  • [15] Igarashi G, 2014, IEEE PES INNOV SMART
  • [16] System-Level Tests of Transformer Differential Protection Using an IEC 61850 Process Bus
    Ingram, David M. E.
    Schaub, Pascal
    Taylor, Richard R.
    Campbell, Duncan A.
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2014, 29 (03) : 1382 - 1389
  • [17] Performance Analysis of IEC 61850 Sampled Value Process Bus Networks
    Ingram, David M. E.
    Schaub, Pascal
    Taylor, Richard R.
    Campbell, Duncan A.
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2013, 9 (03) : 1445 - 1454
  • [18] Junior P.S.P., 2019, P 2019 IEEE PES INN, P1, DOI 10.1109/ISGT-LA.2019.8895350
  • [19] Laboratory Test Bed for Analyzing Fault-Detection Reaction Times of Protection Relays in Different Substation Topologies
    Jurisic, Goran
    Havelka, Juraj
    Capuder, Tomislav
    Sucic, Stjepan
    [J]. ENERGIES, 2018, 11 (09)
  • [20] Performance of IEC 61850-9-2 Process Bus and Corrective Measure for Digital Relaying
    Kanabar, Mitalkumar G.
    Sidhu, Tarlochan S.
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2011, 26 (02) : 725 - 735