Influence of process bus on performance of power system protection

被引:6
作者
Melo, Andre Felipe Silva [1 ]
Netto, Ulisses Chemin [1 ]
da Silva, Jean Carlos Cardozo [2 ]
Dreyer, Uilian Jose [1 ]
机构
[1] Grad Program Energy Syst, Av 7,Setembro 3165, BR-80230901 Curitiba, Parana, Brazil
[2] Grad Program Elect & Comp Engn, Av 7,Setembro 3165, BR-80230901 Curitiba, Parana, Brazil
关键词
Process bus; IEC; 61850-9-2; 61850-9-2LE; 61869-9; Protection relays; Power system measurements and protection;
D O I
10.1016/j.epsr.2021.107491
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The development of substation operations under open standards has ensured interoperability among technology manufacturers and has led to system management evolution. Implementing a Process Bus (PB) and its related technologies represents the future of power systems protection. The release of the IEC61850-9-2 sampled values protocol has allowed the replacement of the conventional measurement method by an ethernet-based system at substation yards. This study focuses on the PB implementation effects such as the trip time delay and possible time shift over the protection system performance. The paper points out aspects that should be considered through the engineering process and design, considering the two PB standards, IEC61850-9-2LE and IEC61869-9. A test architecture was composed of a conventional relay, and two PB relays synchronized using the IEEE-1588Precision Time Protocol (PTP). Four tests were carried out, including a software simulation and field-collection data. The two PB standards presented similar results during the tests. The relay signal resampling results in time shifts that should be properly compensated, and the digitalization delays found can occasionally add more than 9 ms in the final trip time and must be considered in protection studies prior to implementation. Otherwise, it can significantly impact on the project of the power system.
引用
收藏
页数:8
相关论文
共 27 条
  • [1] IEC 61850 based substation automation system: A survey
    Aftab, Mohd Asim
    Hussain, S. M. Suhail
    Ali, Ikbal
    Ustun, Taha Selim
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 120
  • [2] [Anonymous], 2014, IFAC P, DOI DOI 10.3182/20140824-6-ZA-1003.00598
  • [3] [Anonymous], 2020, IEEE 1588-2019
  • [4] Bayindir R, 2016, IEEE INT POWER ELEC, P388, DOI 10.1109/EPEPEMC.2016.7752029
  • [5] Buck J.R., 2001, Computer Explorations in Signals and Systems Using MATLAB, V2nd
  • [6] Cenzon E., 2017, PROC W PROTECTIVE RE, P1
  • [7] Chase S., 2019, 72 ANN C PROTECTIVE, P1
  • [8] Precise Amplitude and Phase Determination Using Resampling Algorithms for Calibrating Sampled Value Instruments
    Chen, Yeying
    Mohns, Enrico
    Seckelmann, Michael
    de Rose, Soeren
    [J]. SENSORS, 2020, 20 (24) : 1 - 22
  • [9] Impedance-Based Fault Location in Transmission Networks: Theory and Application
    Das, Swagata
    Santoso, Surya
    Gaikwad, Anish
    Patel, Mahendra
    [J]. IEEE ACCESS, 2014, 2 : 537 - 557
  • [10] IEEE 1588 time synchronisation performance for IEC 61850 transmission substations
    Han, Mingyu
    Guo, Hao
    Crossley, Peter
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 107 : 264 - 272