Successful Increase of Outpatient Clinic Continuity in a Fellowship Quality Improvement Project

被引:1
|
作者
Srinivasan, Ranjini [1 ]
Sambatakos, Peter [1 ]
Lane, Mariellen [1 ]
Krishnan, Usha [1 ]
Weller, Rachel [1 ]
Flyer, Jonathan N. [1 ,2 ]
Robinson, Keith [2 ]
Glickstein, Julie [1 ]
机构
[1] Columbia Univ, Med Ctr, Morgan Stanley Childrens Hosp New York, New York, NY 10032 USA
[2] Univ Vermont, Childrens Hosp, Robert Larner MD Coll Med, Burlington, VT USA
关键词
CARE; ASSOCIATION; EDUCATION; OUTCOMES; TIME;
D O I
10.1097/pq9.0000000000000306
中图分类号
R72 [儿科学];
学科分类号
100202 ;
摘要
Background: Patient-to-physician continuity is the result of coordinated and consistent care. Optimizing continuity can be a challenge in medical training without impacting work hours. We sought to use quality improvement science during graduate medical training to increase outpatient continuity. Objective: The primary goal was to improve outpatient continuity in our pediatric cardiology fellowship, without increasing trainee clinic hours, from a baseline of 38% to >= 70% within 18 months. Methods: Our fellowship conducted a quality improvement project across 3 years to improve continuity-of-care in our outpatient clinic using the Institute for Healthcare Improvement model for improvement. We conducted Plan-Do-Study-Act cycles and completed a key driver diagram using a multidisciplinary team. We defined continuity as a patient being evaluated by their primary fellow or a different fellow that was provided a handoff. The outcome measure was the continuity rate over 2-week periods. Results: Continuity improved from 38% to >= 80%. The improvement resulted from a series of interventions, including creating a handoff system among fellows, identifying follow-up patients in advance, and communicating this information to the clinic team. Although we anticipated a decrease when new fellows were incorporated, continuity continued to be >= 70%. This system retained continuity above 90% one year after completion of the project. Conclusions: Our fellowship created a system change to improve primary patient-to-fellow continuity care rates. We achieved sustainable continuity by working with a multidisciplinary team without altering staffing, infrastructure, or fellow work hours. This project engaged trainees to address the practical application of quality improvement methodology to solve a common clinical problem.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Roadmap to a successful quality improvement project
    Swanson, J. R.
    Pearlman, S. A.
    JOURNAL OF PERINATOLOGY, 2017, 37 (02) : 112 - 115
  • [2] Successful quality improvement project to increase hydroxyurea prescriptions for children with sickle cell anaemia
    Alvarez, Ofelia A.
    Rodriguez-Cortes, Hector
    Clay, E. Leila Jerome
    Echenique, Sandra
    Kanter, Julie
    Strouse, John J.
    Buitrago-Mogollon, Talia
    Courtlandt, Cheryl
    Noonan, Laura
    Osunkwo, Ifeyinwa
    BMJ QUALITY & SAFETY, 2023, 32 (10) : 608 - 616
  • [3] Implementation of a quality improvement strategy to increase outpatient kidney transplant referrals
    Farouk, Samira S.
    Atallah, Sara
    Campbell, Kirk N.
    Vassalotti, Joseph A.
    Uribarri, Jaime
    BMC NEPHROLOGY, 2020, 21 (01)
  • [4] Improving the Management of Tibia Stress Fractures A Collaborative, Outpatient Clinic-Based Quality Improvement Project
    Roberts, Cindy L.
    Meyering, Christopher D.
    Zychowicz, Michael E.
    ORTHOPAEDIC NURSING, 2014, 33 (02) : 75 - 83
  • [5] A Successful Quality Improvement Project for Detection and Management of Acute Stroke in Hospitalized Patients
    Droegemueller, Carol J.
    Kashyap, Bhavani
    Wagner, Roberta L. Huna
    Shibeshi, Hannah
    Clayton, Mitchell W.
    Fennig, Mary W.
    Hussein, Haitham M.
    JOURNAL OF NEUROSCIENCE NURSING, 2020, 52 (04) : 186 - 191
  • [6] A Process Evaluation of an Outpatient Palliative Care Program: A Quality Improvement Project
    Liguori, David
    JOURNAL OF HOSPICE & PALLIATIVE NURSING, 2018, 20 (03) : 245 - 251
  • [7] Efficacy of a Longitudinal Project-Based Quality Improvement Curriculum in Pediatric Cardiology Fellowship
    Bird, Cara M.
    Kaushal, Sonia
    Trivedi, Mira K.
    Moore, Judson A.
    Sheth, Shreya S.
    PEDIATRIC CARDIOLOGY, 2025, 46 (01) : 127 - 133
  • [8] Increasing Patient Attendance in a Pediatric Obesity Clinic: A Quality Improvement Project
    Geer, Betty
    Porter, Renee M.
    Haemer, Matthew
    Krajicek, Marilyn J.
    JOURNAL OF PEDIATRIC NURSING-NURSING CARE OF CHILDREN & FAMILIES, 2014, 29 (06): : 528 - 535
  • [9] Improving Inpatient Colonoscopy Bowel Preparation: A Successful Quality Improvement Project
    Damjanovska, Sofi
    Watanabe, Shota
    Karb, Daniel B.
    Kurin, Michael
    Isenberg, Gerard
    AMERICAN JOURNAL OF MEDICAL QUALITY, 2024, 39 (04) : 154 - 160
  • [10] A Quality Improvement Project to Increase Mother's Milk Use in an Inner-City NICU
    Kalluri, Nikita S.
    Burnham, Laura A.
    Lopera, Adriana M.
    Stickney, Donna M.
    Combs, Ginny L.
    Levesque, Bernadette M.
    Philipp, Barbara L.
    Parker, Margaret G.
    PEDIATRIC QUALITY & SAFETY, 2019, 4 (05) : E204