Laboratory Investigation of IEC 61850-9-2-Based Busbar and Distance Relaying With Corrective Measure for Sampled Value Loss/Delay

被引:34
作者
Kanabar, Mitalkumar G. [1 ]
Sidhu, Tarlochan S. [1 ]
Zadeh, Mohammad R. D. [2 ]
机构
[1] Univ Western Ontario, Dept Elect & Comp Engn, London, ON N6A 5B9, Canada
[2] GE Digital Energy, Markham, ON L6E 1B3, Canada
关键词
IEC; 61850-9-2; intelligent electronic device (IED); process bus; sampled values (SVs); substation automation system (SAS);
D O I
10.1109/TPWRD.2011.2159033
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
After successful implementation of IEC 61850-8-1-based GOOSE at several power substations worldwide, major protective device vendors are currently developing interoperable products for IEC 61850-9-2-based time-critical sampled value (SV) messages over the digital process bus. Unlike GOOSE, the same SV message is not repeated several times and, therefore, it is important to analyze the impact of SV loss or delay on protection functions. This paper presents the hardware implementation of a typical IEC 61850-9-2-based process bus communication network for digital protection systems to investigate the proposed corrective measure for SV loss/delay. For the detailed testing, various process bus devices (e.g. protection intelligent electronic devices (IEDs), merging units (MUs), etc.) are developed over industrial embedded systems with a hard-real-time platform. The SV estimation algorithm is implemented as a part of bus differential and transmission-line distance protection IEDs, and it is tested for various SV loss/delay scenarios and power system fault conditions.
引用
收藏
页码:2587 / 2595
页数:9
相关论文
共 16 条
  • [1] Andersson L., 2008, CIGRE SESS PAR FRANC
  • [2] [Anonymous], 2009, COMPUTER RELAYING PO
  • [3] [Anonymous], 2003, 61850 IEC
  • [4] [Anonymous], 2004, IMPLEMENTATION GUIDE
  • [5] [Anonymous], 2011, QNX REAL TIM OP SYST
  • [6] An open-system approach to power system protection and control integration
    Demeter, E
    Sidhu, TS
    Faried, SO
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2006, 21 (01) : 30 - 37
  • [7] Hoga C., 2010, P PROT AUT CONTR WOR, P8
  • [8] Holbach J., 2007, Protective Relay Engineers, P283
  • [9] Hossenlopp L., 2008, CIGRE SESS PAR FRANC
  • [10] Jian-Cheng T., 2009, Power Systems Conference and Exposition, P1