Accelerating the process of engineering change orders: Capacity and congestion effects

被引:53
作者
Loch, CH [1 ]
Terwiesch, C [1 ]
机构
[1] Univ Penn, Wharton Sch, Dept Operat & Informat Management, Philadelphia, PA 19104 USA
关键词
D O I
10.1016/S0737-6782(98)00042-3
中图分类号
F [经济];
学科分类号
02 ;
摘要
Engineering change orders (ECOs) are important drivers of development costs and lean time, This article analyzes the process of administering engineering change orders in the case of the climate control system development within a large vehicle development project. This administrative process encompasses the emergence of a change (e.g., a problem or a market-driven feature change), its management approval, and final implementation. Despite strong time pressure, this process cart take several weeks, several months, and, in extreme cases, even over year. Such a long lend time is especially remarkable as the actual processing time for the change typically does not exceed 2 weeks. Based on our case study,, we develop art analytical framework that explains how such an extreme ratio between theoretical processing time and actual lean time is possible. The framework identifies congestion stemming from scarce capacity coupled with processing variability?,, as a major lean time contributor. We outline five improvement strategies that an organization can use in order to reduce ECO lend time, namely, flexible capacity: balanced workloads, merged tasks, pooling, and reduced setups and batching. (C) 1999 Elsevier Science Inc.
引用
收藏
页码:145 / 159
页数:15
相关论文
共 27 条
[1]   FROM PROJECT TO PROCESS MANAGEMENT - AN EMPIRICALLY-BASED FRAMEWORK FOR ANALYZING PRODUCT DEVELOPMENT TIME [J].
ADLER, PS ;
MANDELBAUM, A ;
NGUYEN, V ;
SCHWERER, E .
MANAGEMENT SCIENCE, 1995, 41 (03) :458-484
[2]  
ADLER PS, 1996, HARVARD BUSINESS MAR, P134
[3]  
Bayus BL, 1997, J PROD INNOVAT MANAG, V14, P485, DOI 10.1016/S0737-6782(97)00062-3
[4]  
Blackburn J. D., 1991, Time-based competition: the next battleground in American manufacturing
[5]  
Blackburn JD, 1992, BUS HORIZONS, V35, P96
[6]   EMPIRICAL-EVALUATION OF A QUEUING NETWORK MODEL FOR SEMICONDUCTOR WAFER FABRICATION [J].
CHEN, H ;
HARRISON, JM ;
MANDELBAUM, A ;
VANACKERE, A ;
WEIN, LM .
OPERATIONS RESEARCH, 1988, 36 (02) :202-215
[7]  
Clark K.B., 1991, PRODUCT DEV PERFORMA
[8]  
Cusumano Michael A., 1995, MICROSOFT SECRETS WO
[9]   Advantages of time-based new product development in a fast-cycle industry [J].
Datar, S ;
Jordan, CC ;
Kekre, S ;
Rajiv, S ;
Srinivasan, K .
JOURNAL OF MARKETING RESEARCH, 1997, 34 (01) :36-49
[10]   ENGINEERING INFORMATION RELEASE PRIOR TO FINAL DESIGN FREEZE [J].
EASTMAN, RM .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1980, 27 (02) :37-42