Short-term hydro generation operation of cascade hydropower stations in Han River, China

被引:0
作者
Zhang, Rui [1 ]
Wang, Xuemin [1 ]
Yu, Shan [1 ]
Zou, Qiang [1 ]
机构
[1] Changjiang Survey Planning Design & Res CO LTD, Wuhan 430010, Hubei, Peoples R China
来源
2018 3RD ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2018) | 2018年 / 366卷
关键词
POWER GRIDS; OPTIMIZATION; SYSTEMS;
D O I
10.1088/1757-899X/366/1/012004
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Hydropower is a natural renewable energy with outstanding technological superiority in short-term operation. Short-term hydro generation operation (SHGO) requires not only lord dispatch in single station, but also the coordination of hydraulic and electric connection for different stations. In this paper, a coordinated peak shaving operation method of cascade hydropower stations is proposed. Firstly, regular pattern of peak load regulation is analyzed using the load characteristics of power grid. The daily power output of cascade hydropower stations should meet the needs of typical load pattern. In order to satisfy comprehensive utilizations of water resources, the outflow of each reservoir should be no less than the demand of water supply or irrigation. To verify the feasibility and effectiveness of the proposed method, an application of Pankou and Xiaoxuan cascade hydropower stations, located in Hanjiang River in China, is presented in this paper. Simulation results indicate that the proposed method can obtain the maximum peak shaving amplitudes and suggested peak shaving amplitudes at the same time, which satisfies different operation demands of cascade hydropower stations.
引用
收藏
页数:6
相关论文
共 22 条
[11]   Optimal short-term generation scheduling of hydrothermal systems by implementation of real-coded genetic algorithm based on improved Muhlenbein mutation [J].
Nazari-Heris, M. ;
Mohammadi-Ivatloo, B. ;
Haghrah, A. .
ENERGY, 2017, 128 :77-85
[12]   Measurements and simulations for peak electrical load reduction in cooling dominated climate [J].
Sadineni, Suresh B. ;
Boehm, Robert F. .
ENERGY, 2012, 37 (01) :689-697
[13]   Optimization of peak loads among multiple provincial power grids under a central dispatching authority [J].
Shen, Jianjian ;
Cheng, Chuntian ;
Wu, Xinyu ;
Cheng, Xiong ;
Li, Weidong ;
Lu, Jianyu .
ENERGY, 2014, 74 :494-505
[14]   Energy storage systems providing primary reserve and peak shaving in small isolated power systems: An economic assessment [J].
Sigrist, Lukas ;
Lobato, Enrique ;
Rouco, Luis .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 53 :675-683
[15]  
Song Hong-kun, 2007, Electric Power Automation Equipment, V27, P47
[16]   A study on the characteristics, predictions and policies of China's eight main power grids [J].
Wang, Jianzhou ;
Dong, Yao ;
Jiang, He .
ENERGY CONVERSION AND MANAGEMENT, 2014, 86 :818-830
[17]   Coincidence probability of precipitation for the middle route of South-to-North water transfer project in China [J].
Yan, Baowei ;
Chen, Lu .
JOURNAL OF HYDROLOGY, 2013, 499 :19-26
[18]   Closed-loop optimization control on fan speed of air-cooled steam condenser units for energy saving and rapid load regulation [J].
Yang, Tingting ;
Wang, Wei ;
Zeng, Deliang ;
Liu, Jizhen ;
Cui, Can .
ENERGY, 2017, 135 :394-404
[19]   Overall review of pumped-hydro energy storage in China: Status quo, operation mechanism and policy barriers [J].
Zeng Ming ;
Zhang Kun ;
Liu Daoxin .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2013, 17 :35-43
[20]   A hybrid particle swarm optimization with small population size to solve the optimal short-term hydro-thermal unit commitment problem [J].
Zhang, Jingrui ;
Tang, Qinghui ;
Chen, Yalin ;
Lin, Shuang .
ENERGY, 2016, 109 :765-780