Short-term hydro generation operation of cascade hydropower stations in Han River, China

被引:0
作者
Zhang, Rui [1 ]
Wang, Xuemin [1 ]
Yu, Shan [1 ]
Zou, Qiang [1 ]
机构
[1] Changjiang Survey Planning Design & Res CO LTD, Wuhan 430010, Hubei, Peoples R China
来源
2018 3RD ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2018) | 2018年 / 366卷
关键词
POWER GRIDS; OPTIMIZATION; SYSTEMS;
D O I
10.1088/1757-899X/366/1/012004
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Hydropower is a natural renewable energy with outstanding technological superiority in short-term operation. Short-term hydro generation operation (SHGO) requires not only lord dispatch in single station, but also the coordination of hydraulic and electric connection for different stations. In this paper, a coordinated peak shaving operation method of cascade hydropower stations is proposed. Firstly, regular pattern of peak load regulation is analyzed using the load characteristics of power grid. The daily power output of cascade hydropower stations should meet the needs of typical load pattern. In order to satisfy comprehensive utilizations of water resources, the outflow of each reservoir should be no less than the demand of water supply or irrigation. To verify the feasibility and effectiveness of the proposed method, an application of Pankou and Xiaoxuan cascade hydropower stations, located in Hanjiang River in China, is presented in this paper. Simulation results indicate that the proposed method can obtain the maximum peak shaving amplitudes and suggested peak shaving amplitudes at the same time, which satisfies different operation demands of cascade hydropower stations.
引用
收藏
页数:6
相关论文
共 22 条
[2]  
Arnel G, 2014, ENERGY, V77, P97
[3]   Short-term peak shaving operation for multiple power grids with pumped storage power plants [J].
Cheng, Chun-Tian ;
Cheng, Xiong ;
Shen, Jian-Jian ;
Wu, Xin-Yu .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 67 :570-581
[4]   A novel fuzzy control algorithm for reducing the peak demands using energy storage system [J].
Chua, Kein Huat ;
Lim, Yun Seng ;
Morris, Stella .
ENERGY, 2017, 122 :265-273
[5]   Overall review of peaking power in China: Status quo, barriers and solutions [J].
Ding, Ning ;
Duan, Jinhui ;
Xue, Song ;
Zeng, Ming ;
Shen, Jianfei .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 42 :503-516
[6]  
Hubei electric power company State Grid, 2010, 12 5 YEAR DEV PLAN H
[7]   The impact of inter-regional transmission grid expansion on China's power sector decarbonization [J].
Li, Ying ;
Lukszo, Zofia ;
Weijnen, Margot .
APPLIED ENERGY, 2016, 183 :853-873
[8]   Short-term hydro generation scheduling of Xiluodu and Xiangjiaba cascade hydropower stations using improved binary-real coded bee colony optimization algorithm [J].
Lu, Peng ;
Zhou, Jianzhong ;
Wang, Chao ;
Qiao, Qi ;
Mo, Li .
ENERGY CONVERSION AND MANAGEMENT, 2015, 91 :19-31
[9]   Modelling and analysis of a novel compressed air energy storage system for trigeneration based on electrical energy peak load shifting [J].
Lv, Song ;
He, Wei ;
Zhang, Aifeng ;
Li, Guiqiang ;
Luo, Bingqing ;
Liu, Xianghua .
ENERGY CONVERSION AND MANAGEMENT, 2017, 135 :394-401
[10]   Short-term hydro generation scheduling of Three Gorges-Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach [J].
Mo, Li ;
Lu, Peng ;
Wang, Chao ;
Zhou, Jianzhong .
ENERGY CONVERSION AND MANAGEMENT, 2013, 76 :260-273