Multi-neighborhood based path relinking for two-sided assembly line balancing problem

被引:8
作者
Yang, Zhaoyang [1 ,2 ]
Zhang, Guojun [1 ]
Zhu, Haiping [1 ]
机构
[1] Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Peoples R China
[2] Hubei Univ Automot Technol, Sch Automot Engn, Shiyan 442002, Peoples R China
基金
中国国家自然科学基金;
关键词
Two-sided assembly line balancing problem; Local search; Path relinking; Multi-neighborhood search; GENETIC ALGORITHM;
D O I
10.1007/s10878-015-9959-6
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a multi-neighborhood based path relinking algorithm (MN-PR) for solving the two-sided assembly line balancing problem. By incorporating an effective local search into a path relinking framework, the proposed MN-PR algorithm integrates a number of distinguishing features, such as a multi-neighborhood based local search procedure, a dedicated path relinking operator to generate new solutions and a strategy to fix an infeasible solution generated by the path relinking procedure to a feasible one. Our proposed MN-PR algorithm is tested on a set of totally 45 public instances widely used in the literature. Comparisons with other reference algorithms show the efficacy of the proposed algorithm in terms of the solution quality. Particularly, the proposed MN-PR algorithm is able to improve the best upper bounds for one instance with 65 tasks and 326 cycle time. This paper also presents an analysis to show the significance of the main components of the proposed algorithm.
引用
收藏
页码:396 / 415
页数:20
相关论文
共 50 条
[1]   Multi-neighborhood based path relinking for two-sided assembly line balancing problem [J].
Zhaoyang Yang ;
Guojun Zhang ;
Haiping Zhu .
Journal of Combinatorial Optimization, 2016, 32 :396-415
[2]   A review of two-sided assembly line balancing problem [J].
Make, Muhammad Razif Abdullah ;
Ab Rashid, Mohd Fadzil Faisae ;
Razali, Muhamad Magffierah .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 89 (5-8) :1743-1763
[3]   Heuristic Algorithm for Two-sided Assembly Line Balancing Problem with Multi-objectives [J].
Hu, Xiaofeng .
2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, :1407-1410
[4]   Bees Algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem [J].
Tapkan, Pinar ;
Ozbakir, Lale ;
Baykasoglu, Adil .
OPTIMIZATION LETTERS, 2012, 6 (06) :1039-1049
[5]   Two-sided U-type assembly line balancing problem [J].
Agpak, Kursad ;
Yeguel, M. Fatih ;
Gokcen, Hadi .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) :5035-5047
[6]   Two-sided assembly line balancing problem with parallel performance capacity [J].
Sepahi, Abdollatif ;
Naini, Seyed Gholamreza Jalali .
APPLIED MATHEMATICAL MODELLING, 2016, 40 (13-14) :6280-6292
[7]   A harmony search based algorithm for a stochastic two-sided assembly line balancing problem [J].
Wu, Jiaxi ;
Jiang, Wei ;
Shi, Leyuan .
2021 IEEE 17TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2021, :606-611
[8]   A Mathematical Model for Two-sided Assembly Line Balancing Problem in Motorcycle Production [J].
Mohammed, Fatini Dalili ;
Juin, Tan Wan ;
Zakaria, Mohd Zakimi ;
Ramli, Mohammad Fadzli .
2018 IEEE 5TH INTERNATIONAL CONFERENCE ON SMART INSTRUMENTATION, MEASUREMENT AND APPLICATION (ICSIMA), 2018,
[9]   Branch, bound and remember algorithm for two-sided assembly line balancing problem [J].
Li, Zixiang ;
Kucukkoc, Ibrahim ;
Zhang, Zikai .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 284 (03) :896-905
[10]   Bees Algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem [J].
Pınar Tapkan ;
Lale Özbakır ;
Adil Baykasoğlu .
Optimization Letters, 2012, 6 :1039-1049