Multicriteria scheduling problems: A survey

被引:59
作者
T'kindt, V [1 ]
Billaut, JC [1 ]
机构
[1] Ecol Ingn & Informat Ind, Lab Informat, F-37200 Tours, France
来源
RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH | 2001年 / 35卷 / 02期
关键词
scheduling; multicriteria optimization; state-of-the-art;
D O I
10.1051/ro:2001109
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a state-of-the-art survey on multicriteria scheduling and introduces a definition of a multicriteria scheduling problem. It provides a framework that allows to tackle multicriteria scheduling problems, according to Decision Aid concepts. This problem is decomposed into three different problems. The first problem is about obtaining a model. The second one is how to take criteria into account and the third one is about solving a scheduling problem. An extension to an existing notation for scheduling problems is proposed for multicriteria scheduling problems. Then, basic results from tli, literature on multicriteria optimization are presented. These results are used tu build the final scheduling problem to solve. Finally a survey is presented for one-machine, parallel machines and flowshop multicriteria scheduling problems.
引用
收藏
页码:143 / 163
页数:21
相关论文
共 110 条
[1]   Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method [J].
Adamopoulos, GI ;
Pappis, CP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (02) :336-344
[2]   MINIMIZING THE WEIGHTED SUM OF LATE AND EARLY COMPLETION PENALTIES IN A SINGLE-MACHINE [J].
AHMED, MU ;
SUNDARARAGHAVAN, PS .
IIE TRANSACTIONS, 1990, 22 (03) :288-290
[3]  
ALCAIDE D, 1998, P 6 INT WORKSH PROJ, P151
[4]   2 PARALLEL MACHINE SEQUENCING PROBLEMS INVOLVING CONTROLLABLE JOB PROCESSING TIMES [J].
ALIDAEE, B ;
AHMADIAN, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) :335-341
[5]   Scheduling job families about an unrestricted common due date on a single machine [J].
Azizoglu, M ;
Webster, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (05) :1321-1330
[6]  
Azizoglu M., 1997, MULTICRITERIA ANAL, P279
[7]  
BAGCHI U, 1987, NAV RES LOG, V34, P739, DOI 10.1002/1520-6750(198710)34:5<739::AID-NAV3220340513>3.0.CO
[8]  
2-3
[9]   MINIMIZING MEAN ABSOLUTE DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE [J].
BAGCHI, U ;
SULLIVAN, RS ;
CHANG, YL .
NAVAL RESEARCH LOGISTICS, 1986, 33 (02) :227-240
[10]   MINIMIZING MEAN SQUARED DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE [J].
BAGCHI, U ;
SULLIVAN, RS ;
CHANG, YL .
MANAGEMENT SCIENCE, 1987, 33 (07) :894-906