OPTIMAL MAINTENANCE OF A SERIES PRODUCTION SYSTEM WITH TWO MULTI-COMPONENT SUBSYSTEMS AND AN INTERMEDIATE BUFFER

被引:6
作者
Zhou, Yifan [1 ,2 ]
Zhang, Zhisheng [1 ]
机构
[1] Southeast Univ, Sch Mech Engn, Nanjing 211189, Jiangsu, Peoples R China
[2] Xuzhou Inst Technol, Jiangsu Key Lab Large Engn Equipment Detect & Con, Xuzhou 221018, Peoples R China
来源
EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY | 2015年 / 17卷 / 02期
基金
中国国家自然科学基金; 高等学校博士学科点专项科研基金;
关键词
series-parallel systems; intermediate buffers; Markov decision process; policy iteration; generalized minimum residual method; PARALLEL UNRELIABLE MACHINES; MARKOV DECISION ALGORITHM; MULTIPLE FAILURE MODES; PREVENTIVE MAINTENANCE; PERFORMANCE EVALUATION; MANUFACTURING SYSTEM; PRODUCTION LINES; FINITE BUFFER; AVAILABILITY; OPTIMIZATION;
D O I
10.17531/ein.2015.2.20
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Intermediate buffers often exist in practical production systems to reduce the influence of the breakdown and maintenance ef subsystems on system production. At the same time, the effects of intermediate buffers also make the degradation process of the system more difficult to model. Some existing papers investigate the performance evaluation and maintenance optimisation of a production system with intermediate buffers under a predetermined maintenance strategy structure. However, only few papers pay attention to the property of the optimal maintenance strategy structure. This paper develops a method based on the Markov decision process to identify the optimal maintenance strategy for a series-parallel system with two multi-component subsystems and an intermediate buffer. The structure of the obtained optimal maintenance strategy is analysed, which shows that the optimal strategy structure cannot be modelled by a limited number of parameters. However, some useful properties of the strategy structure are obtained, which can simplify the maintenance optimisation. Another interesting finding is that a large buffer capacity cannot always bring about high average revenue even through the cost of holding an item in the buffer is much smaller than the production revenue per item.
引用
收藏
页码:314 / 325
页数:12
相关论文
共 25 条
[1]   Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines [J].
Alexandros, Diamantidis C. ;
Chrissoleon, Papadopoulos T. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 197 (02) :572-580
[2]   Maintenance scheduling incorporating dynamics of production system and real-time information from workstations [J].
Arab, Ali ;
Ismail, Napsiah ;
Lee, Lai Soon .
JOURNAL OF INTELLIGENT MANUFACTURING, 2013, 24 (04) :695-705
[3]  
Barrett R., 1994, TEMPLATES SOLUTION L
[4]   An aggregation method for performance evaluation of a tandem homogenous production line with machines having multiple failure modes [J].
Belmansour, Ahmed-Tidjani ;
Nourelfath, Mustapha .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2010, 95 (11) :1193-1201
[5]   APPROXIMATE ANALYSIS OF TRANSFER LINES WITH UNRELIABLE MACHINES AND FINITE BUFFERS [J].
DALLERY, Y ;
DAVID, R ;
XIE, XL .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1989, 34 (09) :943-953
[6]   A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times [J].
Dimitrakos, T. D. ;
Kyriakidis, E. G. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :752-762
[7]   Hidden maintenance opportunities in discrete and complex production lines [J].
Gu, Xi ;
Lee, Seungchul ;
Liang, Xinran ;
Garcellano, Mark ;
Diederichs, Mark ;
Ni, Jun .
EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (11) :4353-4361
[8]   Optimizing the product-based availability of a buffered industrial process [J].
Hamada, Michael ;
Martz, Harry F. ;
Berg, Eric C. ;
Koehler, Arthur J. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (09) :1039-1048
[9]   Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer [J].
Karamatsoukis, C. C. ;
Kyriakidis, E. G. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :297-308
[10]   Optimal preventive maintenance of a production system with an intermediate buffer [J].
Kyriakidis, EG ;
Dimitrakos, TD .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (01) :86-99