Trial mix programme and full-scale trials for Olivenhain RCC dam, USA

被引:0
|
作者
Pauletto, M [1 ]
Dunstan, MRH [1 ]
Ortega, F [1 ]
机构
[1] Kiewit Pacific Co, Washington, DC USA
来源
ROLLER COMPACTED CONCRETE DAMS | 2003年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The RCC placement at Olivenhain dam was successfully completed in October 2002 in the USA. Some 900,000 m 3 of RCC was placed in seven months making it one of the fastest RCC dams so far constructed. The dam is a straight-gravity structure, 97 m high and 778 m long and is part of the San Diego County Water Authority's Emergency Storage Project for the San Diego region of California to provide water for the area in the event of a severe earthquake or drought. An extensive trial mix programme was conducted by the Contractor, Kiewit Pacific Co., in parallel with that being undertaken by the Designer, to try to simplify the method of construction. In addition, prior to the start of placement of the RCC in the critical dam section in the main valley, a series of full-scale trials were constructed in different parts of the Project. The paper describes the objectives of the different stages of the trial mix programme. Details of the construction of the different full-scale trials are also included as are details of the training programmes developed for the different activities associated with the RCC method of construction. The quantity of RCC placed at Olivenhain in full-scale trials, prior to start placing RCC in the main dam, was considerably more than usual. Rather than this being initially planned, the main reason was the design of the dam itself, which included two shaping blocks as replacement for poor foundations. These were utilised as full-scale trials. Nevertheless, the paper shows that the trials were an excellent opportunity to allow all of those involved with the construction of the dam to get some way up the "learning curve" before the start of RCC placement in the main dam body.
引用
收藏
页码:329 / 338
页数:10
相关论文
共 50 条
  • [1] RCC mix design programme for the Olivenhain dam
    Rogers, M.F.
    Kline Jr., R.A.
    Hartman, R.J.
    International Journal on Hydropower and Dams, 2000, 7 (03): : 42 - 44
  • [2] Full-scale trials for RCC
    de Andrade, MAS
    Traboulsi, MA
    Bittencourt, RM
    de Andrade, WP
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 891 - 895
  • [3] Controlling RCC mix workability for Olivenhain dam construction
    Bennett, BC
    Rugh, MP
    Stiady, JL
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 923 - 932
  • [4] Trial mix programme for Jahgm Dam - the first major RCC dam in Iran
    Ghafuri, AG
    Omran, ME
    Dunstan, MRH
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 255 - 262
  • [5] Benefits of the full-scale trial performed for Beni Haroun dam (Algeria)
    Dunstan, MRH
    Ibáñez-de-Aldecoa, R
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 935 - 941
  • [6] DYNAMIC FULL-SCALE TEST OF AN EARTHFILL DAM
    PETROVSKI, J
    PASKALOV, T
    JURUKOVS.D
    GEOTECHNIQUE, 1974, 24 (02): : 193 - 206
  • [7] VIBRATION TESTS OF FULL-SCALE EARTH DAM
    ABDELGHAFFAR, AM
    SCOTT, RF
    JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1981, 107 (03): : 241 - 269
  • [8] VIBRATION TESTS OF FULL-SCALE EARTH DAM
    Abdel-Ghaffar, Ahmed M.
    Scott, Ronald F.
    Journal of the Geotechnical Engineering Division, 1981, 107 (03): : 241 - 269
  • [9] THE DAGBLADET FULL-SCALE PRINTING TRIALS .1. METHODOLOGY OF TRIAL RUNS
    HANSEN, A
    MOESTUE, P
    MOLLER, K
    THOMASSEN, B
    NOSTDAL, H
    TAPPI JOURNAL, 1994, 77 (01): : 139 - 145
  • [10] Pilot Trial Characteristics, Postpilot Design Modifications, and Feasibility of Full-Scale Trials
    Ying, Xiangji
    Ehrhardt, Stephan
    JAMA NETWORK OPEN, 2023, 6 (09) : E2333642