Computation of strict long-run marginal cost for different HV consumers

被引:3
作者
Biskas, Pandelis N. [1 ]
Bakirtzis, Grigorios A. [1 ]
Chatziathanasiou, Vasilis [1 ]
机构
[1] Aristotle Univ Thessaloniki, Dept Elect Engn, Thessaloniki 54124, Greece
关键词
Generation expansion planning; Long-run marginal cost; Marginal capacity cost; Marginal operating cost; Mixed-integer linear programming; Perturbation approach; SYSTEM; CAPACITY; TARIFFS; MILP;
D O I
10.1016/j.epsr.2015.06.024
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper the strict long-run marginal cost (LRMC) for the ratemaking of High Voltage (HV) consumers is computed, along with the constituent parts of LRMC, namely the marginal capacity cost and the marginal operating cost. The computation is performed using the perturbation approach, employing a generation expansion planning model in order to compute the optimal generation capacity expansion program that could cover the future increased demand. The perturbation is performed using realistic data from five HV consumers in Greece, which are used as demand increments for the overall system demand. The attained LRMCs are compared and conclusions are drawn regarding the effect of the consumption profile on the LRMC. A sensitivity analysis is performed considering an increasing demand increment for each HV consumer, in order to evaluate the effect of the increment magnitude on the LRMCs. Moreover, the Marginal Capacity Cost and the Marginal Operating Cost are computed in all cases. All tests are performed using the Greek electricity market, and the planning period for the LRMC computation is 20 years. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:66 / 78
页数:13
相关论文
共 31 条
[11]  
Kacso A., 1996, 19 INT C INT ASS EN
[12]  
Kahn A.E., 1988, The Economics of Regulation: Principles and Institutions
[13]  
Li F., 2007, IEEE POW ENG SOC GEN
[14]   Long-run incremental cost pricing based on unused capacity [J].
Li, Furong ;
Tolley, David L. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :1683-1689
[15]   Long-run marginal cost pricing based on network spare capacity [J].
Li, Furong .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (02) :885-886
[16]   Electricity tariffs based on long-run marginal costs for central grid system of Oman [J].
Malik, Arif S. ;
Al-Zubeidi, Salem .
ENERGY, 2006, 31 (12) :1703-1714
[17]  
Marsden Jacob Associates, 2004, EST LONG RUN MARG CO
[18]   ELECTRICITY PRICING - A COMPREHENSIVE FRAMEWORK [J].
MUNASINGHE, M .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (08) :3959-3968
[19]  
Munasinghe M., 1992, ELECT POWER EC
[20]  
MUNASINGHE M, 1982, ELECT PRICING THEORY