Optimality conditions for a two-stage reservoir operation problem

被引:67
作者
Zhao, Jianshi [1 ,2 ]
Cai, Ximing [2 ]
Wang, Zhongjing [1 ]
机构
[1] Tsinghua Univ, Dept Hydraul Engn, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
基金
美国国家科学基金会;
关键词
WATER-SUPPLY OPERATIONS; HEDGING RULE; OPTIMIZATION; RELIABILITY; DROUGHT;
D O I
10.1029/2010WR009971
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper discusses the optimality conditions for standard operation policy (SOP) and hedging rule (HR) for a two-stage reservoir operation problem using a consistent theoretical framework. The effects of three typical constraints, i.e., mass balance, nonnegative release, and storage constraints under both certain and uncertain conditions are analyzed. When all nonnegative constraints and storage constraints are unbinding, HR results in optimal reservoir operation following the marginal benefit (MB) principle (the MB is equal over current and future stages. However, if any of those constraints are binding, SOP results in the optimal solution, except in some special cases which need to carry over water in the current stage to the future stage, when extreme drought is certain and a higher marginal utility exists for the second stage. Furthermore, uncertainty complicates the effects of the various constraints. A higher uncertainty level in the future makes HR more favorable as water needs to be reserved to defend against the risk caused by uncertainty. Using the derived optimality conditions, an algorithm for solving a numerical model is developed and tested with the Miyun Reservoir in China.
引用
收藏
页数:16
相关论文
共 19 条
[1]  
Bazaraa M.S., 1990, LINEAR PROGRAMMING N, DOI DOI 10.1002/0471787779
[2]  
Bower B.T., 1962, DESIGN WATER RESOURC, P443
[3]  
BURNESS HS, 1981, ESSAYS HONOR WEILER, P107
[4]   Optimal hedging and carryover storage value [J].
Draper, AJ ;
Lund, JR .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2004, 130 (01) :83-87
[5]  
GEORGAKAKOS AP, 1989, WATER RESOUR BULL, V25, P789
[6]   RELIABILITY, RESILIENCY, AND VULNERABILITY CRITERIA FOR WATER-RESOURCE SYSTEM PERFORMANCE EVALUATION [J].
HASHIMOTO, T ;
STEDINGER, JR ;
LOUCKS, DP .
WATER RESOURCES RESEARCH, 1982, 18 (01) :14-20
[7]  
KLEMES V, 1977, WATER RESOUR RES, V13, P850, DOI DOI 10.1029/WR013I005P00837
[8]  
Loucks D.P., 1981, WATER RESOURCES SYST
[9]  
Maass A., 1962, DESIGN WATER RESOURC
[10]  
Masse P., 1946, RESERVES REGULATION, V1