Evaluating the impact of alternative plans on manufacturing performance

被引:21
作者
Usher, JM [1 ]
机构
[1] Mississippi State Univ, Dept Ind Engn, Mississippi State, MS 39762 USA
关键词
process planning; alternative process plans; CAPP; dynamic process planning; scheduling;
D O I
10.1016/S0360-8352(03)00076-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In recent years, process planners have become interested in the development of dynamic process planning systems that can interface to scheduling systems providing alternative process plans to increase flexibility in scheduling. However, deciding how many alternatives are needed has not been addressed in any previous studies. This paper presents the results of a simulation-based study aimed at characterizing the benefit provided from having altemative plans available for use in scheduling. This benefit is quantified in terms of the overall performance of a job-shop manufacturing environment. The results of this study indicate that the advantage gained by increasing the number of altemative process plans diminishes rapidly. In fact, under some conditions for the particular system studied, increasing the number of alternatives actually resulted in degraded system performance. Based on these results developers of process planning systems and methodologies need to evaluate carefully the benefit of expending time and resources on the generation of altemative plans or optimal plans. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:585 / 596
页数:12
相关论文
共 14 条
[1]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[2]   Development of manufacturing control strategies using unsupervised machine learning [J].
Bowden, R ;
Bullington, SF .
IIE TRANSACTIONS, 1996, 28 (04) :319-331
[3]  
CHO H, 1994, J ENG IND-T ASME, V116, P108, DOI 10.1115/1.2901800
[4]   A PROGRESSIVE APPROACH FOR THE INTEGRATION OF PROCESS PLANNING AND SCHEDULING [J].
HUANG, SH ;
ZHANG, HC ;
SMITH, ML .
IIE TRANSACTIONS, 1995, 27 (04) :456-464
[5]  
IWATA K, 1989, CIRP INT WORKSH HANN, P104
[6]  
KHOSHNEVIS B, 1990, J INTELL MANUF, V1, P165
[7]   DYNAMIC PLANNING ENRICHES CONCURRENT PROCESS AND PRODUCTION PLANNING [J].
LARSEN, NE ;
ALTING, L .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (08) :1861-1876
[8]   THE INTEGRATION OF PROCESS PLANNING AND MACHINE LOADING IN SMALL BATCH PART MANUFACTURING [J].
LENDERINK, A ;
KALS, HJJ .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1993, 10 (1-2) :89-98
[9]   INTEGRATED DESIGN OF CELLULAR MANUFACTURING SYSTEMS IN THE PRESENCE OF ALTERNATIVE PROCESS PLANS [J].
RAJAMANI, D ;
SINGH, N ;
ANEJA, YP .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (08) :1541-1554
[10]  
SIHONG Y, 1997, IEEE INT C INT PROC, P1366