共 98 条
[43]
Hilal A.H., 2013, INT INTERDISCIPLINAR, V2, P181, DOI [10.12816/0002914, DOI 10.12816/0002914]
[45]
Hughes Rami, 2014, Construction Innovation, V14, P210, DOI 10.1108/CI-03-2013-0016
[46]
SYNCHRONISING TENDER DRAWINGS AND DOCUMENTS AS AN AID FOR DISCREPANCIES
[J].
4TH INTERNATIONAL BUILDING CONTROL CONFERENCE 2016 (IBCC 2016),
2016, 66
[47]
Enhancing the Quality of Construction Environment by Minimizing the Cost Variance
[J].
AMER INTERNATIONAL CONFERENCE ON QUALITY OF LIFE, AICQOL2014,
2014, 153
:70-78
[48]
Jarkas Abdulaziz M., 2014, International Journal of Design Engineering, V5, P323, DOI 10.1504/IJDE.2014.067076
[49]
Kahvandi Z., 2019, Journal of Engineering, Project, and Production Management, V9, P2, DOI DOI 10.2478/JEPPM-2019-0002
[50]
RISK MANAGEMENT PERCEPTIONS AND TRENDS OF US CONSTRUCTION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1995, 121 (04)
:422-429