Collaborative performance measurement in supply chain

被引:55
作者
Papakiriakopoulos, Dimitris [1 ]
Pramatari, Katerina [1 ]
机构
[1] Athens Univ Econ & Business, Dept Management Sci & Technol, ELTRUN, Res Ctr, Athens, Greece
关键词
Supply chain management; Performance measurement (quality); Inventory; Partnership; BALANCED SCORECARD; DEMAND INFORMATION; MEASUREMENT SYSTEM; MANAGEMENT; METRICS; IMPACT; TRACEABILITY; DYNAMICS; BENEFITS; LESSONS;
D O I
10.1108/02635571011087400
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Purpose - The objective of this paper is to demonstrate the challenges when developing a common performance measurement system (PMS) in the context of a collaborative supply chain. Design/methodology/approach - The paper utilizes qualitative and quantitative data from a case study. The qualitative data refer to the assessment of collaborative performance measures based on interviews with experts, while the quantitative data demonstrate the use of two performance measures in a collaborative supply chain network. Findings - The development of a collaborative PMS is a challenging task. Through the systematic study of two significant performance measures for a supply chain, it was found that the one could not be supported due to reliability restrictions, while the other requires the development of a complex information system. Based on these, a discussion of specific challenges follows. Research limitations/implications - The paper has the general case study limitations. Practical implications - Companies operating in supply chain networks need to synchronize existing business processes and data before the design of a new PMS. Selecting the measures and the measurement method is not a trivial task. Important challenges reveal when dealing with, underlying data, business processes and the evaluation method of a PMS in supply chains. Originality/value - The management control function usually focuses on the design and development of PMSs for a single organization. Limited knowledge exists when more than two companies require the development of a PMS for a jointly agreed business process.
引用
收藏
页码:1297 / 1318
页数:22
相关论文
共 71 条
[1]   Applying the Balanced Scorecard concept: An experience report [J].
Ahn, H .
LONG RANGE PLANNING, 2001, 34 (04) :441-461
[2]  
Akintoye A., 2000, European Journal of Purchasing & Supply Management, V6, P159, DOI 10.1016/S0969-7012(00)00012-5
[3]   The impact of contextual and process factors on the evaluation of activity-based costing systems [J].
Anderson, SW ;
Young, SM .
ACCOUNTING ORGANIZATIONS AND SOCIETY, 1999, 24 (07) :525-559
[4]  
[Anonymous], 1998, LOGISTICS INFORM MAN
[5]  
[Anonymous], 2003, STRATEGIES CASE STUD
[6]  
Azzone G., 1991, International Journal of Operations & Production Management, V11, P77, DOI 10.1108/01443579110143412
[7]   Measuring supply chain performance [J].
Beamon, BM .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1999, 19 (3-4) :275-292
[8]   Dynamics of performance measurement systems [J].
Bititci, US ;
Turner, T ;
Begemann, C .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2000, 20 (5-6) :692-704
[9]   Exploiting timely demand information to reduce inventories [J].
Bourland, KE ;
Powell, SG ;
Pyke, DF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 92 (02) :239-253
[10]  
Bourne M, 2005, PROD PLAN CONTROL, V16, P101, DOI 10.1080/0953728051233133301