共 50 条
- [33] Improving labor productivity with U-shaped assembly lines DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1257 - 1259
- [34] Ergonomics in parallelized car assembly: A case study, with reference also to productivity aspects APPL. ERGON., 2 (101-110):
- [37] Improving the plastic ball grid array assembly yield: A case study Journal of the Chinese Institute of Industrial Engineers, 2006, 23 (04): : 311 - 318
- [39] Paint spray booth design using recirculation/partitioning ventilation ENVIRONMENTAL PROGRESS, 1998, 17 (03): : 199 - 202
- [40] RADIATION PROCESS-CONTROL AND EQUIPMENT PROCESS OR PAINT BOOTH RADIATION PHYSICS AND CHEMISTRY, 1977, 9 (1-3): : 119 - 129