A case study on improving productivity in paint booth assembly

被引:1
|
作者
Jayakumar, P. [1 ]
Kumar, V. R. Sathish [1 ]
机构
[1] Amrita Vishwa Vidyapeetham, Dept Mech Engn, Amrita Sch Engn, Coimbatore, India
关键词
Cycle Time; Total Operating Cycle Time; Value Added activity; Non-Value-Added activity; Time study and Productivity; MANUFACTURING-INDUSTRY; IMPROVEMENT;
D O I
10.1016/j.matpr.2022.04.288
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Currently, all automotive industries are faced with the need to respond to rapidly changing customer needs, their desires and the fluctuations in the market demand. During the plant visit and subsequent discussion made with the production department and also according to the operation process chart put up in the process study, it was noticed that the efficient time involved in the sub assembly process is less. Hence, this project work is conducted live to study the existing cycle time of a single model sub assembly line and suggesting improved methods to reduce the non-value-added activities, thereby reducing the cycle time in order to improve the efficiency of the sub assembly line and increase overall productivity. This case study is conducted in a leading garage equipment manufacturing industry in south India, which engages in manufacturing, designing and servicing garage equipment's. Currently, this plant is manufacturing 25 paint booths (1.4 paint booth assembly per shift) which the company foresees a growth in demand for paint booth assembly and gearing to scale up its production rate to 40 paint booths (2.5 paint booth assembly in a shift) including Sub assembly 6 which has been newly added in the paint booth assembly to meet out its monthly requirement and achieved.Copyright (c) 2022 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the scientific committee of the Second International Conference on Engineering Materials, Metallurgy and Manufacturing.
引用
收藏
页码:1054 / 1059
页数:6
相关论文
共 50 条
  • [21] Today's paint spray booth: no waste; no pollution
    Anon
    Modern Metals, 1988, 44 (07):
  • [22] Innovative spray booth technology for the 'green' paint shop
    Systems D.
    Metal Finishing, 2010, 108 (05) : 42 - 43
  • [23] SUSPENDED PAINT SLUDGE SKIMMED FROM BOOTH WATER
    HOGAN, BJ
    DESIGN NEWS, 1980, 36 (10) : 120 - 121
  • [24] Capture of overspray powder paint in a wet booth system
    General Motors Research and, Development Cent, Warren, United States
    J Coat Technol, 875 (23-31):
  • [25] Simulation analysis for managing and improving productivity A case study of an automotive company
    El-Khalil, Raed
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2015, 26 (01) : 36 - 56
  • [26] A DEA approach for improving productivity of packaging production lines: a case study
    Jagoda, Kalinga
    Thangarajah, Pamini
    PRODUCTION PLANNING & CONTROL, 2014, 25 (02) : 193 - 202
  • [27] Improving the Productivity of Industrial Systems: A Simulation-Based Case Study
    Ramos, Ana Luisa
    Ferreira, Jose Vasconcelos
    Bernardes, Fabio
    Nunes, Fernando
    INTERNATIONAL CONFERENCE ON ADVANCED MANUFACTURE TECHNOLOGY AND INDUSTRIAL APPLICATION, AMTIA 2016, 2016, : 287 - 291
  • [28] Improving productivity and water use efficiency: A case study of farms in England
    Gadanakis, Yiorgos
    Bennett, Richard
    Park, Julian
    Areal, Francisco Jose
    AGRICULTURAL WATER MANAGEMENT, 2015, 160 : 22 - 32
  • [29] Improving Productivity and Standard Time Updating in an Industrial Company - A Case Study
    Araujo, Mariana
    Amaral, Gabriela
    Varela, Leonilde
    Machado, Jose
    Trojanowska, Justyna
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF MECHATRONICS AND CYBER-MIXMECHATRONICS - 2017, 2018, 20 : 220 - 228
  • [30] Improving Productivity in Food Processing Industries Using Simulation - A Case Study
    Abed, Seraj Yousef
    NEW ASPECTS OF SYSTEMS, PTS I AND II, 2008, : 596 - +