A case study on improving productivity in paint booth assembly

被引:1
|
作者
Jayakumar, P. [1 ]
Kumar, V. R. Sathish [1 ]
机构
[1] Amrita Vishwa Vidyapeetham, Dept Mech Engn, Amrita Sch Engn, Coimbatore, India
关键词
Cycle Time; Total Operating Cycle Time; Value Added activity; Non-Value-Added activity; Time study and Productivity; MANUFACTURING-INDUSTRY; IMPROVEMENT;
D O I
10.1016/j.matpr.2022.04.288
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Currently, all automotive industries are faced with the need to respond to rapidly changing customer needs, their desires and the fluctuations in the market demand. During the plant visit and subsequent discussion made with the production department and also according to the operation process chart put up in the process study, it was noticed that the efficient time involved in the sub assembly process is less. Hence, this project work is conducted live to study the existing cycle time of a single model sub assembly line and suggesting improved methods to reduce the non-value-added activities, thereby reducing the cycle time in order to improve the efficiency of the sub assembly line and increase overall productivity. This case study is conducted in a leading garage equipment manufacturing industry in south India, which engages in manufacturing, designing and servicing garage equipment's. Currently, this plant is manufacturing 25 paint booths (1.4 paint booth assembly per shift) which the company foresees a growth in demand for paint booth assembly and gearing to scale up its production rate to 40 paint booths (2.5 paint booth assembly in a shift) including Sub assembly 6 which has been newly added in the paint booth assembly to meet out its monthly requirement and achieved.Copyright (c) 2022 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the scientific committee of the Second International Conference on Engineering Materials, Metallurgy and Manufacturing.
引用
收藏
页码:1054 / 1059
页数:6
相关论文
共 50 条
  • [1] Improving competitiveness of an assembly line by simulation based productivity increase - A case study
    Mares, Albert
    Sabadka, Dusan
    Molnar, Vieroslav
    Fedorko, Gabriel
    JOURNAL OF COMPETITIVENESS, 2023, 15 (03) : 43 - 59
  • [2] Paint booth maintenance
    Middendorf, Larry
    Metal Finishing, 2002, 100 (10) : 47 - 52
  • [3] Paint Shop Productivity Improvements with Offline Programming: A Case Study
    Khan M.A.
    Sahu D.K.
    Sengar A.K.
    Journal of The Institution of Engineers (India): Series C, 2023, 104 (03) : 629 - 634
  • [4] Development of Paint Booth: "New Paint Mist Collection Method"
    Iida, Tatsuya
    Mitani, Hiroya
    Sato, Mamoru
    SAE INTERNATIONAL JOURNAL OF MATERIALS AND MANUFACTURING, 2016, 9 (03) : 844 - 849
  • [5] TIPS ON PAINT SPRAY BOOTH SELECTION
    不详
    MATERIALS PROTECTION AND PERFORMANCE, 1972, 11 (08): : 41 - &
  • [6] Paint booth supply air filtration
    Duello, Leu
    Reaman, David
    McPhail, Hugh
    Metal Finishing, 2002, 100 (05) : 26 - 30
  • [7] Improving the Bayer Process productivity - An industrial case study
    Gontijo, Glayson Stopa
    Brandao de Araujo, Antonio Carlos
    Prasad, Shiva
    Sales Vasconcelos, Luis Gonzaga
    Nicacio Alves, Jose Jailson
    Brito, Romildo Pereira
    MINERALS ENGINEERING, 2009, 22 (13) : 1130 - 1136
  • [8] ENVIRONMENTAL-CONTROL OF A LARGE PAINT BOOTH
    BRADLEY, A
    BODSWORTH, PL
    ANNALS OF OCCUPATIONAL HYGIENE, 1983, 27 (02): : 223 - 224
  • [9] Improving the Performance of Assembly Line: Review with case study
    Rane, Arun B.
    Sunnapwar, Vivek K.
    Sudhakar, D. S. S.
    Rane, Santosh
    2015 INTERNATIONAL CONFERENCE ON NASCENT TECHNOLOGIES IN THE ENGINEERING FIELD (ICNTE), 2015,
  • [10] SelfPaint - A self-programming paint booth
    Edelvik, Fredrik
    Tiedje, Oliver
    Jonuscheit, Joachim
    Carlson, Johan S.
    51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 474 - 479