Revisiting Quality Failure Costs in Construction

被引:51
作者
Love, Peter E. D. [1 ]
Teo, Pauline [2 ]
Morrison, John [3 ]
机构
[1] Curtin Univ, Dept Civil Engn, GPO Box U1987, Bentley, WA 6845, Australia
[2] Deakin Univ, Sch Architecture & Built Environm, Fac Sci Engn & Built Environm, 1 Gheringhap St, Geelong, Vic 3220, Australia
[3] Frontline Coach Pty Ltd, 9 Ashmore Ave, Mordialloc, Vic 3195, Australia
基金
澳大利亚研究理事会;
关键词
Benchmarking; Nonconformances; Quality failures; Quality performance; Rework; Contracting; REWORK COSTS; DESIGN;
D O I
10.1061/(ASCE)CO.1943-7862.0001427
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Quality failure costs have been reported to range from less than 1 to over 20% of a project's original contract's value (OCV). Inconsistencies in their definition and determination have rendered such costs often being cited inappropriately to support a case for addressing poor quality in construction. Quality failure costs, which are expressed in the form of nonconformances (NCRs) costs, are derived and analyzed for 218 projects delivered by a contractor between 2006 and 2015. A total of 7,082 NCRs are categorized and quantified in accordance to their cost, and the differences among project type, procurement, and contract size are statistically examined. The analysis revealed that (1)mean NCR costs were 0.18% of OCV; (2)structural steel and concrete subcontracted works had the highest levels of NCRs; and (3)differences were found in the cost of NCRs among different procurement methods and contract sizes. The research provides the international construction community with invaluable insight into the real costs of quality failure that have been borne by a contractor. Thus, the paper makes a call to reinvigorate the need to engage with performance benchmarking so as to engender process improvement throughout the international construction industry.
引用
收藏
页数:10
相关论文
共 39 条
[1]  
Abdul-Rahman H., 1995, CONSTR MANAG ECON, V13, P23, DOI [10.1080/01446199500000004, DOI 10.1080/01446199500000004]
[2]  
[Anonymous], 2015, 9001 ISO, P14
[3]  
[Anonymous], 2013, DESIGNING CLIN RES
[4]  
[Anonymous], CAN J CIV ENG
[5]  
Barber P., 2000, INT J QUAL RELIAB MA, V17, P479, DOI [10.1108/02656710010298544, DOI 10.1108/02656710010298544]
[6]   CAUSES OF QUALITY DEVIATIONS IN DESIGN AND CONSTRUCTION [J].
BURATI, JL ;
FARRINGTON, JJ ;
LEDBETTER, WB .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (01) :34-49
[7]  
Carper K.L., 1987, J PERFORM CONSTR FAC, V1, P132, DOI [10.1061/(ASCE)0887-3828(1987)1:3(132), DOI 10.1061/(ASCE)0887-3828(1987)1:3(132)]
[8]  
Crosby P.B., 1979, QUALITY IS FREE ART
[9]   MEASURING DESIGN AND CONSTRUCTION QUALITY COSTS [J].
DAVIS, K ;
LEDBETTER, WB ;
BURATI, JL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03) :385-400
[10]  
Drdacky M. F., 2001, FORENSIC ENG INVESTI, P165