Design progress for the ITER torus and neutral beam cryopumps

被引:22
作者
Day, Chr. [1 ]
Haas, H. [1 ]
Hanke, St. [1 ]
Hauer, V. [1 ]
Luo, X. [1 ]
Scannapiego, M. [1 ]
Simon, R. [1 ]
Strobel, H. [1 ]
Fellin, F. [2 ]
Laesser, R. [3 ]
Masiello, A. [3 ]
Papastergiou, St. [3 ]
Dremel, M. [4 ]
Mayaux, Chr. [4 ]
Pearce, R. [4 ]
机构
[1] Karlsruhe Inst Technol, Inst Tech Phys, Karlsruhe, Germany
[2] Consorzio RFX, Padua, Italy
[3] Fus Energy, Barcelona, Spain
[4] ITER Org, St Paul Les Durance, France
关键词
Vacuum; cryopump; ITER; Torus; Neutral beam;
D O I
10.1016/j.fusengdes.2010.11.023
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The ITER torus and neutral beam cryopumps are complex vacuum pumps which will be designed to the build-to-print level stage for the call for tender for manufacturing. Although being completely different in size, the pumps share the same concept of cryosorption on activated charcoal. Thus, the design procedure itself can follow the same generic workflow. The requirements on the pumps are summarized and the status of design evolution is described. Both design packages require specific R&D for experimental clarification and design validation. Two examples for this approach are given, namely the characterization of the closing forces of the torus pump inlet valve, and the measurement of hydraulic resistance coefficients of hydroformed components. (C) 2010 Karlsruhe Institute of Technology. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:2188 / 2191
页数:4
相关论文
共 7 条
[1]   R&D and design for the cryogenic and mechanical vacuum pumping systems of ITER [J].
Day, Chr. ;
Antipenkov, A. ;
Dremel, M. ;
Haas, H. ;
Hauer, V. ;
Mack, A. ;
Murdoch, D. K. ;
Wykes, M. .
VACUUM, 2007, 81 (06) :738-747
[2]   Cryopump design development for the ITER Neutral Beam Injectors [J].
Dremel, M. ;
Day, Chr. ;
Hanke, S. ;
Luo, X. .
FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) :689-693
[3]   Performance tests of the ITER model pump [J].
Haas, H ;
Day, C ;
Mack, A ;
Murdoch, DK .
FUSION ENGINEERING AND DESIGN, 2003, 69 (1-4) :91-95
[4]   Design of the ITER torus prototype cryopump [J].
Hauer, V. ;
Boissin, J. -C. ;
Day, Chr. ;
Haas, H. ;
Mack, A. ;
Murdoch, D. ;
Laesser, R. ;
Wykes, M. .
FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) :2113-2119
[5]  
*ITER, 2010, ITER PROJ REQ V 4 6
[6]   3D Monte Carlo vacuum modeling of the neutral beam injection system of ITER [J].
Luo, X. ;
Day, Chr. .
FUSION ENGINEERING AND DESIGN, 2010, 85 (7-9) :1446-1450
[7]  
SCANNAPIEGO M, 2010, P INT C CRYOG ENG WR