An enhanced differential evolution algorithm for daily optimal hydro generation scheduling

被引:57
作者
Yuan, Xiaohui [1 ]
Zhang, Yongchuan [1 ]
Wang, Liang [1 ]
Yuan, Yanbin [2 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
[2] Wuhan Univ Technol, Sch Resources & Environm Engn, Wuhan 430070, Peoples R China
基金
中国国家自然科学基金;
关键词
differential evolution; chaos; hydro plant; daily optimal scheduling;
D O I
10.1016/j.camwa.2007.08.040
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
The daily optimal hydro generation scheduling problem (DOHGSB) is a complicated nonlinear dynamic constrained optimization problem, which plays an important role in the economic operation of electric power systems. This paper proposes a new enhanced differential evolution algorithm to solve DOHGSB. In the proposed method, chaos theory was applied to obtain self-adaptive parameter settings in differential evolution (DE). In order to handle constraints effectively, three simple feasibility-based selection comparison techniques embedded into DE are devised to guide the process toward the feasible region of the search space. The feasibility of the proposed method is demonstrated for the daily generation scheduling of a hydro system with four interconnected cascade hydro plants, and the test results are compared with those obtained by the conjugate gradient and two-phase neural network method in terms of solution quality. The simulation results show that the proposed method is able to obtain higher quality solutions. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2458 / 2468
页数:11
相关论文
共 24 条
[1]   Hydro-thermal scheduling by tabu search and decomposition method [J].
Bai, XM ;
Shahidehpour, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :968-974
[2]   Chaotic sequences to improve the performance of evolutionary algorithms [J].
Caponetto, R ;
Fortuna, L ;
Fazzino, S ;
Xibilia, MG .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2003, 7 (03) :289-304
[3]   Experiences with mixed integer linear programming based approaches on short-term hydro scheduling [J].
Chang, GW ;
Aganagic, M ;
Waight, JG ;
Medina, J ;
Burton, T ;
Reeves, S ;
Christoforidis, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) :743-749
[4]   HYDROELECTRIC GENERATION SCHEDULING WITH AN EFFECTIVE DIFFERENTIAL DYNAMIC-PROGRAMMING ALGORITHM [J].
CHANG, SC ;
CHEN, CH ;
FONG, IK ;
LUH, PB .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (03) :737-743
[5]   Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination [J].
Chen, PH ;
Hang, HG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) :975-981
[6]  
GRAKE JH, 1962, AIEE T PAS, V80, P242
[7]   APPLICATION OF DECOMPOSITION TECHNIQUES TO SHORT-TERM OPERATION PLANNING OF HYDROTHERMAL POWER-SYSTEM [J].
HABIBOLLAHZADEH, H ;
BUBENKO, JA .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1986, 1 (01) :41-47
[9]  
Lampinen J, 2002, IEEE C EVOL COMPUTAT, P1468, DOI 10.1109/CEC.2002.1004459
[10]   SCHEDULING OF HYDROELECTRIC GENERATIONS USING ARTIFICIAL NEURAL NETWORKS [J].
LIANG, RH ;
HSU, YY .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1994, 141 (05) :452-458