Spare parts demand: Linking forecasting to equipment maintenance

被引:62
作者
Wang, Wenbin [2 ]
Syntetos, Aris A. [1 ]
机构
[1] Univ Salford, Salford Business Sch, Ctr OR & Appl Stat, Salford M5 4WT, Lancs, England
[2] Univ Sci & Technol Beijing, Sch Econ & Management, Beijing, Peoples R China
基金
英国工程与自然科学研究理事会;
关键词
Spare parts; Maintenance; Forecasting; Inventory management; Delay time; DELAY-TIME ANALYSIS; INTERMITTENT DEMAND; JOINT OPTIMIZATION; BLOCK-REPLACEMENT; INVENTORY CONTROL; POLICIES; MODELS; SYSTEM; MANAGEMENT; LEVEL;
D O I
10.1016/j.tre.2011.04.008
中图分类号
F [经济];
学科分类号
02 ;
摘要
Demand for spare parts is typically intermittent and forecasting the relevant requirements constitutes a very challenging exercise. Why is the demand for spare parts intermittent and how can we use models developed in maintenance research to forecast such demand? We attempt to answer these questions: we present a novel idea to forecast demand that relies upon the very sources of the demand generation process and we compare it with a well-known time-series method. We conclude that maintenance driven models are associated with a better performance under certain conditions. We also outline an inter-disciplinary agenda for further research in this area. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1194 / 1209
页数:16
相关论文
共 48 条
[1]   Problem identification in maintenance modelling: a case study [J].
Akbarov, A. ;
Christer, A. H. ;
Wang, W. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (04) :1031-1046
[2]  
ALBRIGHT SC, 1993, NAV RES LOG, V40, P479
[3]  
[Anonymous], INT J OPERATIONS PRO
[4]   Joint optimization of maintenance and inventory policies for a simple system [J].
Armstrong, MJ ;
Atkins, DR .
IIE TRANSACTIONS, 1996, 28 (05) :415-424
[5]  
Baker R.D., 1992, Journal of Mathematics Applied in Business and Industry, P259
[6]  
Boylan J. E., 2003, P INT C QUANT METH I, P87
[7]  
Boylan JE, 2008, SPRINGER SER RELIAB, P479, DOI 10.1007/978-1-84800-011-7_20
[8]   Joint optimization of block-replacement and periodic-review spare-provisioning policy [J].
Brezavscek, A ;
Hudoklin, A .
IEEE TRANSACTIONS ON RELIABILITY, 2003, 52 (01) :112-117
[9]   A SURVEY OF MAINTENANCE MODELS FOR MULTIUNIT SYSTEMS [J].
CHO, DI ;
PARLAR, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :1-23
[10]  
Christer A. H., 1995, IMA Journal of Mathematics Applied in Business and Industry, V6, P67, DOI 10.1093/imaman/6.1.67