Construction with digital twin information systems

被引:272
作者
Sacks, Rafael [1 ,2 ]
Brilakis, Ioannis [2 ]
Pikas, Ergo [3 ]
Xie, Haiyan Sally [2 ,4 ]
Girolami, Mark [2 ,5 ]
机构
[1] Technion Israel Inst Technol, Fac Civil & Environm Engn, IL-32000 Haifa, Israel
[2] Univ Cambridge, Dept Engn, Cambridge, England
[3] Aalto Univ, Civil Engn, FI-00076 Aalto, Finland
[4] Illinois State Univ, Dept Technol, Normal, IL 61790 USA
[5] Alan Turing Inst, 2QR,96 Euston Rd, London NW1 2DB, England
来源
DATA-CENTRIC ENGINEERING | 2020年 / 1卷 / 06期
基金
英国工程与自然科学研究理事会; “创新英国”项目;
关键词
Building Information Modeling; construction planning and control; data-centric construction; digital twin; lean construction; PROJECT PERFORMANCE CONTROL; INDUSTRY; TIME; TECHNOLOGY; EQUIPMENT; TRACKING; WORKERS; DESIGN; VIEW;
D O I
10.1017/dce.2020.16
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The concept of a "digital twin" as a model for data-driven management and control of physical systems has emerged over the past decade in the domains of manufacturing, production, and operations. In the context of buildings and civil infrastructure, the notion of a digital twin remains ill-defined, with little or no consensus among researchers and practitioners of the ways in which digital twin processes and data-centric technologies can support design and construction. This paper builds on existing concepts of Building Information Modeling (BIM), lean project production systems, automated data acquisition from construction sites and supply chains, and artificial intelligence to formulate a mode of construction that applies digital twin information systems to achieve closed loop control systems. It contributes a set of four core information and control concepts for digital twin construction (DTC), which define the dimensions of the conceptual space for the information used in DTC workflows. Working from the core concepts, we propose a DTC information system workflow-including information stores, information processing functions, and monitoring technologies-according to three concentric control workflow cycles. DTC should be viewed as a comprehensive mode of construction that prioritizes closing the control loops rather than an extension of BIM tools integrated with sensing and monitoring technologies.
引用
收藏
页数:26
相关论文
共 90 条
[1]  
Adriaans P, 2018, STANFORD ENCY PHILOS, P131
[2]  
Aengenvoort K., 2018, Building Information Modeling: Technology Foundations and Industry Practice, P477
[3]   Monitoring concrete by means of embedded sensors and electromechanical impedance technique [J].
Annamdas, Venu Gopal Madhav ;
Rizzo, Piervincenzo .
SENSORS AND SMART STRUCTURES TECHNOLOGIES FOR CIVIL, MECHANICAL, AND AEROSPACE SYSTEMS 2010, 2010, 7647
[4]  
[Anonymous], 2000, VTT PUBL
[5]  
[Anonymous], 2018, 1965012018 ISO
[6]  
[Anonymous], 2007, P 24 INT S AUT ROB C
[7]  
Arbulu R., 2005, LINKING PRODUCTION L, P199
[8]  
Arup, 2019, AR 13 FITZR STREET L, P159
[9]   Lean project management [J].
Ballard, G ;
Howell, GA .
BUILDING RESEARCH AND INFORMATION, 2003, 31 (02) :119-133
[10]  
Ballard H., 2000, The Last Planner System of Production Control