UNLOCKING VALUE FROM COMPONENT EXCHANGE CONTRACTS IN AVIATION USING SIMULATION-BASED OPTIMISATION

被引:5
作者
Lendermann, Peter [1 ]
Gan, Boon Ping [1 ]
Julka, Nirupam [1 ]
Schirrmann, Arnd [2 ]
Fromm, Helge [2 ]
机构
[1] D SIMLAB Technol Pte Ltd, 9 Jurong Town Hall Rd,IHUB 03-45, Singapore 609431, Singapore
[2] EADS Innovat Works, Dept TCC7, D-21129 Hamburg, Germany
来源
PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE | 2010年
关键词
D O I
10.1109/WSC.2010.5678870
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Motivated by the entry into service of new aircraft such as the Airbus A380 as well as the pressure to operate existing fleets at lower cost, not only in civil but also in military aviation, a new industry paradigm has emerged where MRO (Maintenance, Repair and Overhaul) service providers or OEMs (Original Equipment Manufacturers) supply spare parts to airline operators on a maintenance-by-the-hour basis. As a consequence, the associated logistics networks have reached unprecedented complexity: Component exchange commitments are now made to multiple operators, not only at their main bases but also at outstations. In this setting, the limitations of conventional Initial Provisioning methods can be overcome with high-fidelity simulation-based optimisation techniques. In particular, this paper discusses how value can be unlocked from new logistics policies for spare parts management in aviation.
引用
收藏
页码:2034 / 2045
页数:12
相关论文
共 6 条
[1]  
*AEROSTRATEGY, 2006, FORG AH REV COMM AV
[2]  
Lye KW, 2007, AEROSP CONF PROC, P4578
[3]   Designing a support system for aerospace maintenance supply chains [J].
MacDonnell, Michael ;
Ben Clegg .
JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2007, 18 (02) :139-152
[4]  
RUTLEDGE J, 1997, FAST FLIGHT AIRWORTH, P25
[5]  
Safavi A., 2005, The Journal of Business Forecasting, V24, P2
[6]   Approximate dynamic programming for management of high-value spare parts [J].
Simao, Hugo ;
Powell, Warren .
JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2009, 20 (02) :147-160