Multi-stage restoration strategy for service restoration in distribution systems considering outage duration uncertainty

被引:12
|
作者
Sharma, Anurag [1 ]
Trivedi, Anupam [2 ]
Srinivasan, Dipti [2 ]
机构
[1] Newcastle Univ Int Singapore, Elect & Power Engn, Singapore, Singapore
[2] Natl Univ Singapore, Dept Elect & Comp Engn, Singapore, Singapore
关键词
multi-agent systems; distributed power generation; power distribution reliability; decision making; power system restoration; power distribution faults; maximum entropy methods; multistage restoration strategy; outage duration uncertainty; service restoration problem; decentralised multiagent system method; 119 bus test distribution system; enhanced decision-making; single objective optimisation problem; controlled islanding; distributed generators; maximum entropy principle; 38 bus test distribution system; ENERGY-STORAGE; MICROGRIDS; ALLOCATION; DEMAND; TIME; DG;
D O I
10.1049/iet-gtd.2018.5915
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study proposes a multi-stage restoration strategy to solve the service restoration problem in distribution systems considering the uncertainty of outage duration. Furthermore, it also proposes a restoration index defined in terms of (i) priority of the load restored, (ii) number of switching operations, and (iii) estimated likelihood of the restoration solution to assist the utility in enhanced decision-making. Service restoration is formulated as a single objective optimisation problem considering the maximising of the restoration index as the only objective. A decentralised multi-agent system method is developed to solve the service restoration problem considering controlled islanding of distributed generators. The uncertainty of outage duration is estimated using the maximum entropy principle-based on the cause of the fault. Exhaustive case studies are implemented on a small 38 bus and a large 119 bus test distribution system to demonstrate the effectiveness of the proposed multi-stage restoration strategy to restore the system under outage duration uncertainty.
引用
收藏
页码:4319 / 4326
页数:8
相关论文
共 50 条
  • [1] Multi-stage Service Restoration for Distribution Network with DGs
    Wang F.
    Ding Y.
    Chen C.
    Bin F.
    Lü J.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2019, 46 (04): : 55 - 64
  • [2] Service Restoration for Distribution Network Considering the Uncertainty of Restoration Time
    Li, Jianfang
    Song, Xiaohui
    Wang, Yuting
    Zhang, Xiaohui
    Tang, Wei
    2016 3RD INTERNATIONAL CONFERENCE ON SYSTEMS AND INFORMATICS (ICSAI), 2016, : 188 - 192
  • [3] A Multi-Stage Service Restoration Method for Complex Distribution Networks with Distributed Generators
    Wen J.
    Tan Y.
    He Y.
    Lei K.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2018, 33 (14): : 3332 - 3341
  • [4] Distribution network multi-stage planning considering uncertainty
    Xi'an University of Technology, Xi'an 710048, China
    不详
    Diangong Jishu Xuebao, 2006, 6 (89-95):
  • [5] Restoration Strategy for Active Distribution Systems Considering Endogenous Uncertainty in Cold Load Pickup
    Li, Yujia Lauren
    Sun, Wei
    Yin, Wenqian
    Lei, Shunbo
    Hou, Yunhe
    IEEE TRANSACTIONS ON SMART GRID, 2022, 13 (04) : 2690 - 2702
  • [6] Reliability Analysis of Distribution Systems Considering Service Restoration
    Xu, Yin
    Liu, Chen-Ching
    Gao, Haixiang
    2015 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2015,
  • [7] Reliability Analysis of Distribution Systems Considering Service Restoration
    Xu, Yin
    Liu, Chen-Ching
    Gao, Haixiang
    2015 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2015,
  • [8] New multi-stage restoration method for distribution networks with DGs
    Ghasemi, Sasan
    Khodabakhshian, Amin
    Hooshmand, Rahmat-allah
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2019, 13 (01) : 55 - 63
  • [9] A study on service restoration of distribution networks considering uncertainty in data measurements
    Takano H.
    Murata J.
    Sugawara A.
    Taoka H.
    Takano, Hirotaka (takano@u-fukui.ac.jp), 2017, Institute of Electrical Engineers of Japan (137) : 1052 - 1061
  • [10] Multi-Stage Progressive Image Restoration
    Zamir, Syed Waqas
    Arora, Aditya
    Khan, Salman
    Hayat, Munawar
    Khan, Fahad Shahbaz
    Yang, Ming-Hsuan
    Shao, Ling
    2021 IEEE/CVF CONFERENCE ON COMPUTER VISION AND PATTERN RECOGNITION, CVPR 2021, 2021, : 14816 - 14826