Joint determination of optimal safety stocks and production policy for an imperfect production system

被引:33
作者
Chakraborty, T. [1 ]
Giri, B. C. [1 ]
机构
[1] Jadavpur Univ, Dept Math, Kolkata 700032, India
关键词
Inventory; Production; Machine breakdown and repair; Inspection; PREVENTIVE MAINTENANCE; PROCESS DETERIORATION; INSPECTION SCHEDULES; MACHINE BREAKDOWNS; PRODUCTION CYCLE; EMQ MODEL;
D O I
10.1016/j.apm.2011.07.012
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this article, we develop an imperfect economic manufacturing quantity (EMQ) model for an unreliable production system subject to process deterioration, machine breakdown and repair and buffer stock. The basic model is developed under general process shift, machine breakdown and repair time distributions. We suggest a computational algorithm for determination of the optimal safety stock and production run time which minimize the expected cost per unit time in the steady state. For a numerical example, we illustrate the outcome of the proposed model and perform a sensitivity analysis with respect to the model-parameters which have direct influence on the optimal decisions. (C) 2011 Elsevier Inc. All rights reserved.
引用
收藏
页码:712 / 722
页数:11
相关论文
共 22 条
[1]   Production lot sizing with process deterioration and machine breakdown under inspection schedule [J].
Chakraborty, Tulika ;
Giri, B. C. ;
Chaudhuri, K. S. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2009, 37 (02) :257-271
[2]   Production lot sizing with process deterioration and machine breakdown [J].
Chakraborty, Tulika ;
Giri, B. C. ;
Chaudhuri, K. S. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) :606-618
[3]   Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level [J].
Chelbi, A ;
Rezg, N .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) :131-143
[4]  
Cheung KL, 1997, NAV RES LOG, V44, P257, DOI 10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO
[5]  
2-7
[6]   Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns [J].
Chiu, Singa Wang ;
Wang, Shan-Ling ;
Chiu, Yuan-Shyi Peter .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (02) :664-676
[7]   Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework [J].
Chiu, Yuan-Shyi Peter ;
Cheng, Feng-Tsung ;
Chang, Huei-Hsin .
APPLIED MATHEMATICS LETTERS, 2010, 23 (10) :1152-1155
[8]   Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment [J].
Dohi, T ;
Okamura, H ;
Osaki, S .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) :147-155
[9]   Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems [J].
Gharbi, A. ;
Kenne, J.-P. ;
Beit, M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (02) :422-434
[10]   Exact formulation of stochastic EMQ model for an unreliable production system [J].
Giri, BC ;
Dohi, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (05) :563-575