A huge number of components are typically scheduled for maintenance when a nuclear power plant is shut down for its planned outage. Among these components, a number of them are risk significant so that their operability as well as reliability is of prime concern. Lack of proper maintenance for such components during the outage would impose substantial risk on the nuclear power plant (NPP) operation. In this paper, a new approach based on genetic algorithm (GA) is presented for the optimization of the NPP maintenance schedule during plant outage/overhaul, and all optimizer is developed accordingly. The developed optimizer, coupled with the suggested risk-cost model, compromises the cost in favor of maintaining the risk imposed by each schedule below regulatory/industry set limits. The suggested cost model consists of two elements, one considering the cost incurred by maintenance activities and the other incorporating the loss of revenues if needed, but unscheduled component maintenance causes further plant shutdown. The optimizer is developed in such a way that any risk and/or cost models the user desires call be applied. The performance of the developed GA/optimizer is evaluated by comparing its predictions with Monte Carlo simulation results. It is shown that the GA/optimizer performs significantly better. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:601 / 609
页数:9
相关论文
共 30 条
[1]  
[Anonymous], 1991, Handbook of genetic algorithms
[2]   New method to minimize the preventive maintenance cost of series-parallel systems [J].
Bris, R ;
Châtelet, E ;
Yalaoui, F .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2003, 82 (03) :247-255
[3]   Multiobjective optimization by genetic algorithms: application to safety systems [J].
Busacca, PG ;
Marseguerra, M ;
Zio, E .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2001, 72 (01) :59-74
[4]   Optimization of safety equipment outages improves safety [J].
Cepin, M .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2002, 77 (01) :71-80
[5]  
COLORNI A, 1991, LECT NOTES COMPUTER, V496
[6]  
HADAVI SMH, 1999, P PSA 99 WASH DC
[7]  
HADAVI SMH, 1998, THESIS U MARYLAND CO
[8]   Optimization of standby safety system maintenance schedules in nuclear power plants [J].
Harunuzzaman, M ;
Aldemir, T .
NUCLEAR TECHNOLOGY, 1996, 113 (03) :354-367
[9]  
HOLLAND JH, 1992, GENETIC ALGORITHMS, P66
[10]  
HOLLAND JH, 1975, ADAPTATION NATURAL A