Team Integration and Owner Satisfaction: Comparing Integrated Project Delivery with Construction Management at Risk in Health Care Projects

被引:36
作者
Choi, Jiyong [1 ]
Yun, Sungmin [2 ]
Leite, Fernanda [3 ]
Mulva, Stephen P. [4 ]
机构
[1] Univ Texas Austin, Dept Civil Architectural & Environm Engn, 3925 West Braker Lane,R4500, Austin, TX 78759 USA
[2] Yeungnam Univ, Dept Civil Engn, 280 Daehak Ro, Gyongsan 38541, Gyeongbuk, South Korea
[3] Univ Texas Austin, Dept Civil Architectural & Environm Engn, 1 Univ Stn,C1752, Austin, TX 78712 USA
[4] Construct Ind Inst, 3925 West Braker Lane,R4500, Austin, TX 78759 USA
关键词
Integrated project delivery (IPD); Health care projects; Owner satisfaction; Team integration; Construction management at risk (CMR); PERFORMANCE; SYSTEMS;
D O I
10.1061/(ASCE)ME.1943-5479.0000654
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Team integration among project stakeholders is paramount to achieving successful project outcomes and better value to the owner. Project delivery methods are key influences on the level of team integration as well as project performance. Integrated project delivery (IPD) is receiving increasing attention from both industry and academia because of the high degree of team integration it delivers. However, there is little research on the effects of IPD on the level of team integration and project success in comparison with construction management at risk (CMR). This research investigated how project delivery methods influence the level of team integration achieved in two alternative project delivery methods: IPD and CMR. This study further examined whether the difference in the level of team integration achieved by the two delivery methods has an effect on the degree of owner satisfaction with project outcomes. This study adopted an explanatory case study approach based on mixed research methods including qualitative and quantitative analysis using 17 health care projects executed by Construction Industry Institute (CII) member companies. The results showed that the levels of team integration in the IPD projects were significantly greater than those in the CMR projects, and that the levels of team integration were highly correlated with those of owner satisfaction with project outcomes. This research provides empirical evidence to support that higher team integration achieved by IPD compared to CMR leads to an owner being more satisfied with project outcomes. Although the findings are valid for health care projects delivered by CII members and, thus, need to be interpreted with caution, they can still provide meaningful insights into relationships of project delivery method and team integration with owner's satisfaction. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:11
相关论文
共 61 条
  • [1] AIA AIA California Council, 2012, IPD CAS STUD
  • [2] AIA (American Institute of Architects) and AGC (Associated General Contractors of America), 2011, PRIM PROJ DEL
  • [3] [Anonymous], EFF TEAMW BEST PRACT
  • [4] Ashley D.B., 1987, PROJ MANAG J, V18, P69
  • [5] Azari R., 2014, P CONSTR RES C, P140
  • [6] Critical Look into the Relationship between Information and Communication Technology and Integrated Project Delivery in Public Sector Construction
    Azhar, Nida
    Kang, Youngcheol
    Ahmad, Irtishad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
  • [7] The effect of integration on project delivery team effectiveness
    Baiden, Bernard K.
    Price, Andrew D. F.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) : 129 - 136
  • [8] Ballard G., 2012, 27111 RR U TEX AUST
  • [9] Bender W. J., 2004, P CONSTR RES C, P1
  • [10] Bilbo D., 2015, International Journal of Construction Education and Research, V11, P40, DOI DOI 10.1080/15578771.2013.872734