共 50 条
- [41] Optimization of Preventive Maintenance Period Based on AFSA [J]. 2011 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2011, : 646 - 649
- [42] Joint optimization of batch-discrete re-enter production scheduling and preventive maintenance [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (01): : 44 - 52
- [43] An ant colony algorithm based on opportunities for scheduling the preventive railway maintenance [J]. 2016 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2016, : 594 - 599
- [46] Single-machine-based production scheduling model integrated preventive maintenance planning [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 365 - 375
- [47] OPTIMAL MAINTENANCE SCHEDULING FOR A SYSTEM WITH INDIRECT AND DIRECT PREVENTIVE MAINTENANCE [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2011, 18 (07): : 335 - 343
- [49] Preventive maintenance decisions through maintenance optimization models: a case study [J]. 27TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, FAIM2017, 2017, 11 : 1170 - 1177