Preventive maintenance scheduling optimization based on opportunistic production-maintenance synchronization

被引:45
作者
Li, Li [1 ,2 ]
Wang, Yong [1 ]
Lin, Kuo-Yi [1 ,2 ]
机构
[1] Tongji Univ, Coll Elect & Informat Engn, Shanghai 201804, Peoples R China
[2] Tongji Univ, Shanghai Inst Intelligent Sci & Technol, Shanghai 201804, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Complex manufacturing system; Preventive maintenance; Production-maintenance synchronization; Extreme learning machine; Ant colony optimization; EXTREME LEARNING-MACHINE; GROUPING STRATEGY; SYSTEMS;
D O I
10.1007/s10845-020-01588-9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Equipment maintenance is momentous for improving production efficiency, how to integrate maintenance into production to address uncertain problems has attracted considerable attention. This paper addresses a novel approach for integrating preventive maintenance (PM) into production planning of a complex manufacturing system based on availability and cost. The proposed approach relies on two phases: firstly, this study predicts required capacity of each machine through extreme learning machine algorithm. Based on analyzing historical data, the opportunistic periods are calculated for implementing PM tasks to have less impact on production and obtain the PM interval and duration. Secondly, this study obtains the scheduling planning and the least number of maintenance personnel through an improved ant colony optimization algorithm. Finally, the feasibility and benefits of this approach are investigated based on empirical study by using historical data from real manufacturing execution system and equipment maintenance system. Experimental results demonstrate the effectiveness of proposed approach, reduce personnel number while guarantee the maintenance tasks. Therefore, the proposed approach is beneficial to improve the company's production efficiency.
引用
收藏
页码:545 / 558
页数:14
相关论文
共 50 条
  • [31] Optimization of preventive maintenance through a combined maintenance-production simulation model
    Roux, O.
    Duvivier, D.
    Quesnel, G.
    Ramat, E.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) : 3 - 12
  • [32] Joint Optimization of Production Lot Sizing and Preventive Maintenance Threshold Based on Nonlinear Degradation
    Qu, Li
    Liao, Junli
    Gao, Kaiye
    Yang, Li
    APPLIED SCIENCES-BASEL, 2022, 12 (17):
  • [33] Integrating Competencies into Preventive Maintenance Scheduling with Answer Set Optimization
    Yli-Jyra, Anssi
    Ikavalko, Heini
    Janhunen, Tomi
    FOUNDATIONS OF INFORMATION AND KNOWLEDGE SYSTEMS, FOIKS 2024, 2024, 14589 : 381 - 400
  • [34] Preventive maintenance scheduling via particle swarm optimization method
    Li Che-Hua
    IMECS 2007: International Multiconference of Engineers and Computer Scientists, Vols I and II, 2007, : 121 - 126
  • [35] Preventive opportunistic maintenance strategy for wind turbines based on reliability
    Zhao, Hongshan
    Zhang, Lupeng
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2014, 34 (22): : 3777 - 3783
  • [36] Integrating preventive maintenance planning and production scheduling for a single machine
    Cassady, CR
    Kutanoglu, E
    IEEE TRANSACTIONS ON RELIABILITY, 2005, 54 (02) : 304 - 309
  • [37] An integrated mathematical model for production scheduling and preventive maintenance planning
    Kolus, Ahmet
    El-Khalifa, Ahmed
    Al-Turki, Umar M.
    Duffuaa, Salih Osman
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2020, 37 (6-7) : 925 - 937
  • [38] A Mathematical Program for Scheduling Preventive Maintenance of Cogeneration Plants with Production
    Alhamad, Khaled
    M'Hallah, Rym
    Lucas, Cormac
    MATHEMATICS, 2021, 9 (14)
  • [39] A joint production scheduling approach considering multiple resources and preventive maintenance tasks
    Wong, C. S.
    Chan, F. T. S.
    Chung, S. H.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (03) : 883 - 896
  • [40] Optimization of preventive maintenance schedule and production lot size
    Suliman, Saad M. A.
    Jawad, Sayed Husain
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 137 (01) : 19 - 28