Scheduling of semiconductor test facility via Petri nets and hybrid heuristic search

被引:3
|
作者
Xiong, HH [1 ]
Zhou, MC
机构
[1] Lucent Technol, N Andover, MA 01845 USA
[2] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
关键词
heuristic search; hybrid strategy; Petri net; scheduling; semiconductor test;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes and evaluates two Petri net-based hybrid heuristic search strategies and their applications to semiconductor test facility scheduling. To reduce the setup time, such as the time spent to bring the test facilities to the required temperatures, scheduling multiple lots for each job type together is desirable. Petri nets can concisely model multiple lot sizes for each job, the strict precedence constraints, multiple kinds of resources, concurrent activities and flexible routes. To cope with the complexities for multiple lots scheduling, this paper presents two Petri net-based hybrid heuristic search strategies. They combine the heuristic best-first strategy with the controlled backtracking strategy based on the execution of the Petri nets, The obtained scheduling results are compared and analyzed through a small-size test facility. The better algorithm is also applied to a more sizable facility containing types of resources with a total of 79 pieces and 30 jobs. The future work includes the real-time implementation of the proposed method and scheduling results in real industrial settings.
引用
收藏
页码:384 / 393
页数:10
相关论文
共 50 条
  • [1] Integrating Petri Nets and hybrid heuristic search for the scheduling of FMS
    Reyes, A
    Yu, H
    Kelleher, G
    Lloyd, S
    COMPUTERS IN INDUSTRY, 2002, 47 (01) : 123 - 138
  • [2] Hybrid heuristic search for the scheduling of flexible manufacturing systems using Petri nets
    Moro, AR
    Yu, HN
    Kelleher, G
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2002, 18 (02): : 240 - 245
  • [3] Scheduling of flexible manufacturing systems based on Petri nets and hybrid heuristic search
    Huang, B.
    Sun, Y.
    Sun, Y. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (16) : 4553 - 4565
  • [4] Applications of resource assignment and scheduling with Petri Nets and heuristic search
    Gonzalo Mejía
    Carlos Montoya
    Annals of Operations Research, 2010, 181 : 795 - 812
  • [5] Applications of resource assignment and scheduling with Petri Nets and heuristic search
    Mejia, Gonzalo
    Montoya, Carlos
    ANNALS OF OPERATIONS RESEARCH, 2010, 181 (01) : 795 - 812
  • [6] Shop Scheduling with Time Lags Based on Petri Nets and Heuristic Search
    Li, Xuelian
    Dong, Yunwei
    Yang, Gang
    2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 457 - 462
  • [7] Scheduling AMSs with generalized Petri nets and highly informed heuristic search
    Yuan, Fenglian
    Huang, Bo
    Lv, Jianyong
    Cui, Meiji
    COMPUTERS & OPERATIONS RESEARCH, 2025, 175
  • [8] Deadlock-Free Scheduling of Automated Manufacturing Systems Using Petri Nets and Hybrid Heuristic Search
    Luo, JianChao
    Xing, KeYi
    Zhou, MengChu
    Li, XiaoLing
    Wang, XinNian
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (03): : 530 - 541
  • [9] Scheduling of Flexible Manufacturing Systems Subject to No-Wait Constraints via Petri Nets and Heuristic Search
    Wang, Xinnian
    Xing, Keyi
    Feng, Yanxiang
    Wu, Yunchao
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2021, 51 (10): : 6122 - 6133
  • [10] Hybrid Heuristic Search Based on Petri Net for FMS Scheduling
    Wang, Qiushuang
    Wang, Zhongdong
    2012 INTERNATIONAL CONFERENCE ON FUTURE ELECTRICAL POWER AND ENERGY SYSTEM, PT A, 2012, 17 : 506 - 512