Utility-based decision support system for schedule optimization

被引:21
作者
Yang, I-Tung [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Construct Engn, Taipei 106, Taiwan
关键词
decision support system; utility; optimization; particle swarm optimization; computational intelligence;
D O I
10.1016/j.dss.2007.08.001
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The present study quantifies the impact of individual preferences of decision makers on schedule optimization and proposes a decision support system (DSS) to account for the diversity in the time-cost tradeoff analysis. The proposed DSS defines the multiattribute utility function based on subjective assessment of one-dimensional utility functions and scaling factors of time and cost. The multiattribute utility function is subsequently optimized by aid of a new particle swarm optimization algorithm. The application of the proposed DSS is demonstrated through case studies. It has been verified, both statistically and subjectively, that the proposed DSS is effective, efficient, and robust. It has also been shown that the proposed DSS outperforms genetic algorithms. The formulation of the proposed DSS is of practical value because it considers, in addition to direct and indirect costs, the amount of liquidated damages and bonus for early completion. Moreover, the formulation has no restriction on the forms of activity time-cost functions and therefore provides the most flexibility. (c) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:595 / 605
页数:11
相关论文
共 29 条
  • [1] Angline P, 1998, EVOLUTIONARY OPTIMIZ, V1447, P601, DOI DOI 10.1007/BFB0040753
  • [2] The particle swarm - Explosion, stability, and convergence in a multidimensional complex space
    Clerc, M
    Kennedy, J
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (01) : 58 - 73
  • [3] de Neufville R., 1990, Applied Systems Analysis: Engineering Planning and Technology Management
  • [4] THE DISCRETE TIME-COST TRADEOFF PROBLEM REVISITED
    DE, P
    DUNNE, EJ
    GHOSH, JB
    WELLS, CE
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) : 225 - 238
  • [5] NONLINEAR TIME COST TRADEOFF MODELS IN PROJECT-MANAGEMENT
    DECKRO, RF
    HEBERT, JE
    VERDINI, WA
    GRIMSRUD, PH
    VENKATESHWAR, S
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 28 (02) : 219 - 229
  • [6] Eberhart R., 1995, MHS 95 P 6 INT S MIC, DOI DOI 10.1109/MHS.1995.494215
  • [7] Eberhart RC, 2000, IEEE C EVOL COMPUTAT, P84, DOI 10.1109/CEC.2000.870279
  • [8] Eberhart RC., 2001, SWARM INTELL-US
  • [9] RESOURCE-ALLOCATION VIA DYNAMIC-PROGRAMMING IN ACTIVITY NETWORKS
    ELMAGHRABY, SE
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) : 199 - 215
  • [10] Engelbrecht A.P., 2007, COMPUT INTELL-US