共 50 条
- [1] Space and ground TT&C resource integrated scheduling model Yuhang Xuebao/Journal of Astronautics, 2010, 31 (05): : 1405 - 1412
- [2] Research on CSP Model for Complex TT&C Task Scheduling SYSTEM SIMULATION AND SCIENTIFIC COMPUTING, PT II, 2012, 327 : 318 - +
- [3] Study on the CSP model of satellite TT&C resource scheduling Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2012, 34 (11): : 2275 - 2279
- [5] TT&C Transponder for small satellites Proceedings of the 46th IEEE International Midwest Symposium on Circuits & Systems, Vols 1-3, 2003, : 584 - 589
- [6] Studies on the Standardization of Developing Tracking Telemetry and Control (TT&C) Equipment ISTM/2009: 8TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-6, 2009, : 2440 - 2443
- [7] Research on Dynamic Quality Assessment Model of Spaceflight TT&C Software 2013 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND ARTIFICIAL INTELLIGENCE (ICCSAI 2013), 2013, : 351 - 356
- [8] Improving congestion control algorithm in distributed spaceflight TT&C networks IEEE 2007 INTERNATIONAL SYMPOSIUM ON MICROWAVE, ANTENNA, PROPAGATION AND EMC TECHNOLOGIES FOR WIRELESS COMMUNICATIONS, VOLS I AND II, 2007, : 1134 - 1137
- [9] TT&C Scheduling model and its upper bound solution algorithm Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (09): : 1695 - 1700
- [10] An application of Model Predictive Control for a shipboard crane PROCEEDINGS OF THE 2001 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2001, : 929 - 934