Project scheduling under competition

被引:4
|
作者
Averbakh, I
Lebedev, V
机构
[1] Univ Toronto, Div Management, Scarborough, ON M1C 1A4, Canada
[2] Volgograd State Univ, Dept Math, Volgograd 400062, Russia
关键词
D O I
10.1002/nav.20091
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We introduce and investigate the problem of scheduling activities of a project by a firm that competes with another firm (the competitor) that has to perform the same project. The profit that the firm gets from each activity depends on whether the firm finishes the activity before or after its competitor. The objective is to maximize the guaranteed (worst-case) profit. We assume that both the firm and the competitor can perform only one activity at a time. We perform a detailed complexity analysis of the problem, and consider problems with and without precedence constraints, with and without delay of the competitor, with general and equal processing times of activities. For polynomially solvable cases (which include, for example, all the considered problems without delay of the competitor), we present easily implementable and intuitive rules that allow us to obtain optimal schedules in linear or almost linear time. For some NP-hard cases, we present pseudopolynomial algorithms and fast heuristics with worst-case approximation guarantees. (c) 2005 Wiley Periodicals, Inc.
引用
收藏
页码:481 / 492
页数:12
相关论文
共 50 条
  • [41] Resource-constrained project scheduling under uncertain activity duration
    Willis, RJ
    Pan, HQ
    Yeh, CH
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 429 - 434
  • [42] A GENETIC ALGORITHM FOR PROJECT SCHEDULING IN ACTIVITY NETWORKS UNDER RESOURCE COMPLEMENTARITY
    Silva, Helder
    Oliveira, Jose
    Tereso, Anabela
    ECEC' 2011:17TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE / 7TH FUTURE BUSINESS TECHNOLOGY CONFERENCE, 2011, : 95 - 99
  • [43] A scatter search algorithm for project scheduling under partially renewable resources
    R. Alvarez-Valdes
    E. Crespo
    J. M. Tamarit
    F. Villa
    Journal of Heuristics, 2006, 12 : 95 - 113
  • [44] A target-time-windows technique for project scheduling under uncertainty
    Lamas, Patricio
    Goycoolea, Marcos
    Pagnoncelli, Bernardo
    Newman, Alexandra
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 314 (02) : 792 - 806
  • [45] Resource-constrained project scheduling approach under fuzzy conditions
    Knyazeva, Margarita
    Bozhenyuk, Alexander
    Rozenberg, Igor
    ICTE IN REGIONAL DEVELOPMENT 2015, 2015, 77 : 56 - 64
  • [46] Pro-Reactive Approach for Project Scheduling Under Unpredictable Disruptions
    Zaman, Forhad
    Elsayed, Saber
    Sarker, Ruhul
    Essam, Daryl
    Coello, Carlos A. Coello
    IEEE TRANSACTIONS ON CYBERNETICS, 2022, 52 (11) : 11299 - 11312
  • [47] Project Scheduling under Time Dependent Costs – A Branch and Bound Algorithm
    N.R. Achuthan
    A. Hardjawidjaja
    Annals of Operations Research, 2001, 108 : 55 - 74
  • [48] Project portfolio selection and scheduling problem under material supply uncertainty
    Habibi, Farhad
    Chakrabortty, Ripon Kumar
    Servranckx, Tom
    Abbasi, Alireza
    Vanhoucke, Mario
    OPERATIONS MANAGEMENT RESEARCH, 2024,
  • [49] Maximizing the Net Present Value in Project Scheduling Under Periodic Inflation
    Peymankar, Mahboobe
    Ranjbar, Mohammad
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2021, 38 (04)
  • [50] GRASP and path relinking for project scheduling under partially renewable resources
    Alvarez-Valdes, R.
    Crespo, E.
    Tamarit, J. M.
    Villa, F.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1153 - 1170