Bi-objective optimization for Scheduling and Multi-skilled Worker Assignments in the Hybrid Flow Shop

被引:10
作者
Liu, Ming [1 ]
Yang, Xuenan [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Bi-objective; Multi-skilled worker; Worker assignment; Hybrid flow shop; Scheduling; SEQUENCE-DEPENDENT SETUP; LOCAL SEARCH; MACHINES; METAHEURISTICS; ALGORITHM; 2-STAGE;
D O I
10.1016/j.ifacol.2019.11.520
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper investigate a bi-objective scheduling and worker assignment problem in a hybrid flow shop. The difficulty of this problem lies in four aspects: (i) the workers differ with each other in both the quantity and proficiency of their acquired skilles; (ii) each processing stage is comprised of parallel unrelated machines; (iii) sequence dependent setup time should be considered and respected; (iv) both the makespan and the total flow time should be minimized simultaneously. To solve this bi-objective optimization problem, we first formulate it into a mixed integer linear programming model, then the commonly used exact solution method 6-constraint method is adopted to solve the model. A small instance is randomly generated and tested, the testing result demonstrates the effectiveness of the proposed model. (C) 2019, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:2128 / 2133
页数:6
相关论文
共 26 条
[21]   Cyclic hybrid flow shop scheduling problem with limited buffers and machine eligibility constraints [J].
Soltani, S. Abolfazl ;
Karimi, Behrooz .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 76 (9-12) :1739-1755
[22]   Scheduling tool changes and special jobs on a single machine to minimize makespan [J].
Xu, Dehua ;
Liu, Min ;
Yin, Yungqiang ;
Hao, Jinghua .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2013, 41 (02) :299-304
[23]   Makespan minimization for two parallel machines scheduling with a periodic availability constraint [J].
Xu, Dehua ;
Cheng, Zhenmin ;
Yin, Yunqiang ;
Li, Hongxing .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) :1809-1812
[24]   Some single-machine scheduling problems with past-sequence-dependent setup times and a general learning effect [J].
Yin, Yunqiang ;
Xu, Dehua ;
Wang, Jiayin .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (9-12) :1123-1132
[25]   Determination of the viscoelastic interfacial properties between silica and SNR-based materials via a semi-empirical approach [J].
Yu, Hualong ;
Li, Zhe ;
Jiang, Bing ;
Poldneff, Michael ;
Burkhart, Craig ;
Liu, Wing Kam ;
Wang, Q. Jane .
MECHANICS OF MATERIALS, 2015, 80 :1-12
[26]  
Zandieh M., 2017, INT J SYSTEM ASSURAN, V8, P1