Bi-objective optimization for Scheduling and Multi-skilled Worker Assignments in the Hybrid Flow Shop

被引:10
作者
Liu, Ming [1 ]
Yang, Xuenan [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
来源
IFAC PAPERSONLINE | 2019年 / 52卷 / 13期
基金
中国国家自然科学基金;
关键词
Bi-objective; Multi-skilled worker; Worker assignment; Hybrid flow shop; Scheduling; SEQUENCE-DEPENDENT SETUP; LOCAL SEARCH; MACHINES; METAHEURISTICS; ALGORITHM; 2-STAGE;
D O I
10.1016/j.ifacol.2019.11.520
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper investigate a bi-objective scheduling and worker assignment problem in a hybrid flow shop. The difficulty of this problem lies in four aspects: (i) the workers differ with each other in both the quantity and proficiency of their acquired skilles; (ii) each processing stage is comprised of parallel unrelated machines; (iii) sequence dependent setup time should be considered and respected; (iv) both the makespan and the total flow time should be minimized simultaneously. To solve this bi-objective optimization problem, we first formulate it into a mixed integer linear programming model, then the commonly used exact solution method 6-constraint method is adopted to solve the model. A small instance is randomly generated and tested, the testing result demonstrates the effectiveness of the proposed model. (C) 2019, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:2128 / 2133
页数:6
相关论文
共 26 条
[1]  
Afzalirad M., 2018, J INTELL MANUF, V74, P267
[2]   A comparison of local search algorithms with population-based algorithms in hybrid flow shop scheduling problems with realistic characteristics [J].
Bozorgirad, Mir Abbas ;
Logendran, Rasaratnam .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 83 (5-8) :1135-1151
[3]   Minimizing flow time for the worker assignment problem in identical parallel machine models using GA [J].
Chaudhry, Imran Ali .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (5-8) :747-760
[4]   Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms [J].
Chaudhry, Imran Ali ;
Drake, Paul R. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (5-6) :581-594
[5]   A hybrid genetic algorithm for job sequencing and worker allocation in parallel unrelated machines with sequence-dependent setup times [J].
Costa, A. ;
Cappadonna, F. A. ;
Fichera, S. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (9-12) :2799-2817
[6]   A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem [J].
Costa, Antonio ;
Cappadonna, Fulvio Antonio ;
Fichera, Sergio .
JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (06) :1269-1283
[7]   Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times [J].
Feng, Xin ;
Zheng, Feifeng ;
Xu, Yinfeng .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) :3706-3717
[8]   2-STAGE, HYBRID FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (04) :359-364
[9]   Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times [J].
Hatami, Sara ;
Ruiz, Ruben ;
Andres-Romano, Carlos .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 169 :76-88
[10]   Hybrid flow shop scheduling with not-all-machines options via local search with controlled deterioration [J].
Lei, Deming ;
Guo, Xiuping .
COMPUTERS & OPERATIONS RESEARCH, 2016, 65 :76-82