Job-shop scheduling-joint consideration of production, transport, and storage/retrieval systems

被引:6
作者
Fontes, Dalila B. M. M. [1 ,2 ]
Homayouni, S. Mahdi [1 ]
Resende, Mauricio G. C. [3 ,4 ]
机构
[1] INESC TEC, LIAAD, Porto, Portugal
[2] Univ Porto, Fac Econ, Porto, Portugal
[3] Univ Washington, ISE, Seattle, WA 98195 USA
[4] Amazon Res, Seattle, WA USA
关键词
Job shop scheduling problem; Transport; Storage and retrieval; Joint scheduling; Mathematical programming; Hybrid simulated annealing; AUTOMATED STORAGE; OPTIMIZATION; MACHINES; AS/RS;
D O I
10.1007/s10878-022-00885-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper proposes a new problem by integrating the job shop scheduling, the part feeding, and the automated storage and retrieval problems. These three problems are intertwined and the performance of each of these problems influences and is influenced by the performance of the other problems. We consider a manufacturing environment composed of a set of machines (production system) connected by a transport system and a storage/retrieval system. Jobs are retrieved from storage and delivered to a load/unload area (LU) by the automated storage retrieval system. Then they are transported to and between the machines where their operations are processed on by the transport system. Once all operations of a job are processed, the job is taken back to the LU and then returned to the storage cell. We propose a mixed-integer linear programming (MILP) model that can be solved to optimality for small-sized instances. We also propose a hybrid simulated annealing (HSA) algorithm to find good quality solutions for larger instances. The HSA incorporates a late acceptance hill-climbing algorithm and a multistart strategy to promote both intensification and exploration while decreasing computational requirements. To compute the optimality gap of the HSA solutions, we derive a very fast lower bounding procedure. Computational experiments are conducted on two sets of instances that we also propose. The computational results show the effectiveness of the MILP on small-sized instances as well as the effectiveness, efficiency, and robustness of the HSA on medium and large-sized instances. Furthermore, the computational experiments clearly shown that importance of optimizing the three problems simultaneous. Finally, the importance and relevance of including the storage/retrieval activities are empirically demonstrated as ignoring them leads to wrong and misleading results.
引用
收藏
页码:1284 / 1322
页数:39
相关论文
共 36 条
[1]   On a selection and scheduling problem in automatic storage and retrieval warehouses [J].
Alonso-Ayuso, Antonio ;
Tirado, Gregorio ;
Udias, Angel .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (17) :5337-5353
[2]   Robotized and Automated Warehouse Systems: Review and Recent Developments [J].
Azadeh, Kaveh ;
De Koster, Rene ;
Roy, Debjit .
TRANSPORTATION SCIENCE, 2019, 53 (04) :917-945
[3]   A time window approach to simultaneous scheduling of machines and material handling system in an FMS [J].
Bilge, U ;
Ulusoy, G .
OPERATIONS RESEARCH, 1995, 43 (06) :1058-1070
[4]   A survey on single crane scheduling in automated storage/retrieval systems [J].
Boysen, Nils ;
Stephan, Konrad .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) :691-704
[5]   The late acceptance Hill-Climbing heuristic [J].
Burke, Edmund K. ;
Bykov, Yuri .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 258 (01) :70-78
[6]   Genetic algorithms for studies on AS/RS integrated with machines [J].
Chetty, OVK ;
Reddy, MS .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (11-12) :932-940
[7]   A modified particle swarm optimisation algorithm to solve the part feeding problem at assembly lines [J].
Fathi, Masood ;
Rodriguez, Victoria ;
Fontes, Dalila B. M. M. ;
Alvarez, Maria Jesus .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (03) :878-893
[8]   Joint production and transportation scheduling in flexible manufacturing systems [J].
Fontes, Dalila B. M. M. ;
Homayouni, Seyed Mahdi .
JOURNAL OF GLOBAL OPTIMIZATION, 2019, 74 (04) :879-908
[9]   Models for automated storage and retrieval systems: a literature review [J].
Gagliardi, Jean-Philippe ;
Renaud, Jacques ;
Ruiz, Angel .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) :7110-7125
[10]   Unbounded parallel-batch scheduling under agreeable release and processing to minimize total weighted number of tardy jobs [J].
Gao, Yuan ;
Yuan, Jinjiang .
JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 38 (03) :698-711