Military Equipment Project Interim Evaluation Based on Fuzzy Theory

被引:0
作者
Chen Xiaowei [1 ]
Zhang Junqi [1 ]
Cui Kan [1 ]
机构
[1] Astronaut Engn Univ, Beijing, Peoples R China
来源
ICOMS 2018: 2018 INTERNATIONAL CONFERENCE ON MATHEMATICS AND STATISTICS | 2018年
关键词
Project interim evaluation; Military equipment project; Index system; Fuzzy comprehensive evaluation; Fuzzy c-means algorithm; DECISION-SUPPORT;
D O I
10.1145/3274250.3274265
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Military equipment project interim evaluation has great significance to project management and control. Firstly, the index system is established from five aspects: development, organization and management, performance, prospective benefit and resources, which includes qualitative and quantitative indexes. Then an interim evaluation model is built to solve the hybrid multi-index evaluation problem: the values of qualitative and quantitative indexes are pretreated by fuzzy membership function; the indexes weight vectors are determined by AHP; the evaluation results are calculated by multilevel fuzzy comprehensive evaluation; the evaluation conclusions are analysed by fuzzy c-means algorithm, which avoids the disadvantage of information loss by the maximum membership degree method and information annihilation by weighted average method. Finally, the effectiveness and feasibility are verified by a case study.
引用
收藏
页码:79 / 83
页数:5
相关论文
共 50 条
[21]   Research on Regional Road Safety Evaluation based on Fuzzy Theory [J].
Ma, Zhuanglin ;
Shao, Chunfu ;
Wang, Yalong ;
Ma, Sheqiang .
ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL II, PROCEEDINGS, 2009, :780-+
[22]   Comprehensive Evaluation of Maglev Train Risk Based on Fuzzy Theory [J].
Long, Zhiqiang ;
Ding, Jingfang ;
Fan, Chengxin .
2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, :3879-3884
[23]   Research on Performance Evaluation of Construction project based Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation [J].
Liu, Jinming .
PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND INNOVATIVE EDUCATION (MSIE 2015), 2015, 32 :195-203
[24]   Assessing operational ocean observing equipment (OOOE) based on the fuzzy comprehensive evaluation method [J].
Wang, Yi ;
Li, Yan ;
Liu, Wei ;
Gao, Yanbo .
OCEAN ENGINEERING, 2015, 107 :54-59
[25]   Fuzzy Comprehensive Evaluation on the Sustainable Development of Equipment Manufacturing Industry Based on Improved Algorithm [J].
Shi, Chenghua ;
Zhang, Kui ;
Ruan, Junhu .
IITAW: 2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATIONS WORKSHOPS, 2009, :173-+
[26]   The application of the theory multi-layer fuzzy comprehensive evaluation in engineering project progress management [J].
Sun, H ;
Wang, LH .
PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, :1454-1457
[27]   Study on the Fuzzy Comprehensive Evaluation of Engineering Project Based on the Co-Systems [J].
Mei Hongliang ;
Xia Enjun .
ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, :47-53
[28]   Study on Risk Assessment of Investment Project Decision Based on Fuzzy Comprehensive Evaluation [J].
Wang Mengjun ;
Liu Shaobing ;
Yue Pengwei .
PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, :1001-1004
[29]   The Risk Evaluation Model of Mining Project Investment Based on Fuzzy Comprehensive Method [J].
Wang, Zuogong ;
Zheng, Jie ;
Li, Huiyang .
PROGRESS IN ENVIRONMENTAL PROTECTION AND PROCESSING OF RESOURCE, PTS 1-4, 2013, 295-298 :2928-2934
[30]   Study on the Decision of BOT Project Concession Period Based on a Fuzzy Comprehensive Evaluation [J].
Yu, Qian ;
Zhang, Yunning .
ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 :2299-2303