Military Equipment Project Interim Evaluation Based on Fuzzy Theory

被引:0
|
作者
Chen Xiaowei [1 ]
Zhang Junqi [1 ]
Cui Kan [1 ]
机构
[1] Astronaut Engn Univ, Beijing, Peoples R China
来源
ICOMS 2018: 2018 INTERNATIONAL CONFERENCE ON MATHEMATICS AND STATISTICS | 2018年
关键词
Project interim evaluation; Military equipment project; Index system; Fuzzy comprehensive evaluation; Fuzzy c-means algorithm; DECISION-SUPPORT;
D O I
10.1145/3274250.3274265
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Military equipment project interim evaluation has great significance to project management and control. Firstly, the index system is established from five aspects: development, organization and management, performance, prospective benefit and resources, which includes qualitative and quantitative indexes. Then an interim evaluation model is built to solve the hybrid multi-index evaluation problem: the values of qualitative and quantitative indexes are pretreated by fuzzy membership function; the indexes weight vectors are determined by AHP; the evaluation results are calculated by multilevel fuzzy comprehensive evaluation; the evaluation conclusions are analysed by fuzzy c-means algorithm, which avoids the disadvantage of information loss by the maximum membership degree method and information annihilation by weighted average method. Finally, the effectiveness and feasibility are verified by a case study.
引用
收藏
页码:79 / 83
页数:5
相关论文
共 50 条
  • [1] Fuzzy Comprehensive Evaluation for the Mechanical Equipment Product Project
    Yan, Chen
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2008, : 1775 - 1780
  • [2] Fuzzy comprehensive evaluation of power equipment suppliers based on game theory and combination weighting
    Men Y.
    Qian M.
    Yu Z.
    Teng J.
    Chen S.
    Li X.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2020, 48 (21): : 179 - 186
  • [3] Discussion on Project Interim Evaluation
    BAI Si- jun(School of Management
    InternationalJournalofPlantEngineeringandManagement, 1999, (Z1) : 517 - 523
  • [4] Criticality evaluation of petrochemical equipment based on fuzzy comprehensive evaluation and a BP neural network
    Guo, Lijie
    Gao, Jinji
    Yang, Jianfeng
    Kang, Jianxin
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2009, 22 (04) : 469 - 476
  • [5] Study on Project Management Ability Based on Fuzzy Comprehensive Evaluation
    Liu Shaobing
    Yue Pengwei
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2008, : 733 - 737
  • [6] Equipment Development Risk Evaluation Based on Fuzzy Comprehensive Evaluation
    苏续军
    荣丽卿
    王亚彬
    史宪铭
    JournalofDonghuaUniversity(EnglishEdition), 2015, 32 (06) : 998 - 1000
  • [7] Study on Project Manager Selection Based on Fuzzy Comprehensive Evaluation
    Yue Pengwei
    Wang Mengjun
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 439 - 442
  • [8] Research on the Equipment Support Effectiveness Evaluation Based on Fuzzy Comprehensive Evaluation method
    Zhao, Xiang
    Chen, Gang
    ADVANCED RESEARCH ON MATERIAL ENGINEERING, CHEMISTRY AND BIOINFORMATICS, PTS 1 AND 2 (MECB 2011), 2011, 282-283 : 761 - +
  • [9] Research on Fuzzy Comprehensive Evaluation of Transmission and Transformation Project Based on Analytic Hierarchy Process
    Liu, Shuliang
    Liang, Yijing
    PROCEEDINGS OF THE 2017 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMPUTER AND SOCIETY (EMCS 2017), 2017, 61 : 303 - 313
  • [10] Research of the equipment selected based on AHP and fuzzy comprehensive evaluation method
    Chai Furong
    Wang Hongjun
    PROCEEDINGS OF THE FIFTH INTERNATIONAL SYMPOSIUM ON TEST AUTOMATION & INSTRUMENTATION, VOLS 1 AND 2, 2014, : 565 - 569