A bi-objective truck scheduling problem in a cross-docking center with probability of breakdown for trucks

被引:47
作者
Amini, Alireza
Tavakkoli-Moghaddam, Reza [1 ]
机构
[1] Univ Tehran, Sch Ind Engn, Tehran, Iran
关键词
Cross docking; Truck scheduling; Multi-objective optimization; Breakdown; Response surface methodology; Meta-heuristics; DIFFERENTIAL EVOLUTION; OPTIMIZATION; HEURISTICS; ALGORITHMS; MAKESPAN;
D O I
10.1016/j.cie.2016.03.023
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses a truck scheduling problem in a cross-docking center, in which trucks may confront breakdowns during their service times. In fact, the number of breakdowns in one unit of time for each truck follows a Poisson distribution function. On the other hand, customers are promised to receive required items in a pre-determined time; so, a due date is assigned to each outbound truck. Thus, a bi-objective linear mathematical model is developed inspired by models in the body of the respective literature. A complete enumeration method is employed to find optimum solutions subject to the complexity of large-scale problems, and we modify three multi-objective meta-heuristics; namely, Non-dominated Sorting Genetic Algorithm II (NSGA-II), Multi-Objective Simulated Annealing (MOSA) and Multi-Objective Differential Evolutionary (MODE). In addition, a Response Surface Methodology (RSM) as a statistical tool is used to find an appropriate amount of factors associated with the forgoing meta-heuristics. Finally, the performances of the proposed meta-heuristics are measured and compared with each other. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:180 / 191
页数:12
相关论文
共 37 条
[11]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[12]   The multi-echelon vehicle routing problem with cross docking in supply chain management [J].
Dondo, Rodolfo ;
Mendez, Carlos A. ;
Cerda, Jaime .
COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (12) :3002-3024
[13]   An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems [J].
Forouharfard, S. ;
Zandieh, M. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 51 (9-12) :1179-1193
[14]   Scheduling compound trucks in multi-door cross-docking terminals [J].
Joo, Cheol Min ;
Kim, Byung Soo .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8) :977-988
[15]   OPTIMIZATION BY SIMULATED ANNEALING [J].
KIRKPATRICK, S ;
GELATT, CD ;
VECCHI, MP .
SCIENCE, 1983, 220 (4598) :671-680
[16]   Cost-stable truck scheduling at a cross-dock facility with unknown truck arrivals: A meta-heuristic approach [J].
Konur, Dincer ;
Golias, Mihalis M. .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2013, 49 (01) :71-91
[17]   Scheduling cross docking operations under full, partial and no information on inbound arrivals [J].
Larbi, Rim ;
Alpan, Gulgun ;
Baptiste, Pierre ;
Penz, Bernard .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (06) :889-900
[18]   Vehicle routing scheduling for cross-docking in the supply chain [J].
Lee, Young Hae ;
Jung, Jung Woo ;
Lee, Kyong Min .
COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 51 (02) :247-256
[19]   Simultaneous dock assignment and sequencing of inbound trucks under a fixed outbound truck schedule in multi-door cross docking operations [J].
Liao, T. W. ;
Egbelu, P. J. ;
Chang, P. C. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) :212-229
[20]   Two hybrid differential evolution algorithms for optimal inbound and outbound truck sequencing in cross docking operations [J].
Liao, T. W. ;
Egbelu, P. J. ;
Chang, P. C. .
APPLIED SOFT COMPUTING, 2012, 12 (11) :3683-3697