Disjunctive constraints for manufacturing scheduling: Principles and extensions

被引:13
作者
Baptiste, P
LePape, C
机构
[1] ILOG S.A, Gentilly, F-94253, 2 Avenue Gallieni
关键词
D O I
10.1080/095119296131616
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Disjunctive constraints are widely used to ensure that the time intervals over which two activities require the same resource do not overlap in time. Two types of extensions of disjunctive constraints are proposed: (1) extensions allowing the representation of more complex constraints including activities that may or may not require the resource, 'state resources' to represent activities which may use resources only under specific conditions, and a mechanism to represent setup times between activities; (2) extensions of the disjunctive constraint propagation algorithm to deduce more precise time-bounds. These extensions are integrated in ILOG SCHEDULE, a C++ library for constraint-based scheduling.
引用
收藏
页码:306 / 310
页数:5
相关论文
共 12 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
Applegate D., 1991, ORSA Journal on Computing, V3, P149, DOI 10.1287/ijoc.3.2.149
[3]  
BAPTISTE P, 1994, THESIS U STRATHCLYDE
[4]   ADJUSTMENT OF HEADS AND TAILS FOR THE JOB-SHOP PROBLEM [J].
CARLIER, J ;
PINSON, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (02) :146-161
[5]  
Carlier J., 1990, Annals of Operations Research, V26, P269
[6]  
Carlier J., 1984, THESIS U PARIS 6
[7]  
ERSCHLER J, 1976, THESIS U P SABATIER
[8]  
Le Pape C., 1994, Intelligent Systems Engineering, V3, P55, DOI 10.1049/ise.1994.0009
[9]  
LE PAPE C., 1988, THESIS U PARIS 11
[10]  
LEPAPE C, 1994, P AAAI SIGMAN WORKSH