共 50 条
- [31] A Novel Algorithm for Wafer Sojourn Time Analysis of Single-Arm Cluster Tools With Wafer Residency Time Constraints and Activity Time Variation IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (05): : 805 - 818
- [33] Optimal Scheduling of Time-Constrained Single-arm Cluster Tools with Wafer Revisiting 2016 13TH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS (WODES), 2016, : 355 - 360
- [34] Scheduling and Control of Start-up Process for Time-Constrained Single-Arm Cluster Tools with Parallel Chambers IFAC PAPERSONLINE, 2018, 51 (07): : 251 - 256
- [35] Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net 2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 87 - +
- [37] Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints APPLIED SCIENCES-BASEL, 2024, 14 (20):
- [39] Robot Waiting Time Analysis and Its Impact on Wafer Delay Time of Single-Arm Cluster Tools IFAC PAPERSONLINE, 2020, 53 (04): : 384 - 389