Capacity optimization under uncertainty: The impact of operational time lags

被引:3
作者
Boonman, Hettie J. [1 ]
Siddiqui, Afzal S. [2 ,3 ,4 ]
机构
[1] Netherlands Org Appl Sci Res TNO, The Hague, Netherlands
[2] UCL, Dept Stat Sci, London, England
[3] Stockholm Univ, Dept Comp & Syst Sci, Stockholm, Sweden
[4] HEC Montreal, Dept Decis Sci, Montreal, PQ, Canada
关键词
Investment analysis; Real options; Time lag; Capacity optimization; EXIT DECISIONS; DEMAND UNCERTAINTY; FLEXIBILITY; INVESTMENT; ENTRY; COMPETITION; PRICE;
D O I
10.1016/j.ejor.2017.04.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Time lags in switching operational modes are typical in the manufacturing and power sectors but are not treated in most real options models. In this paper, we consider a firm that has the opportunity to suspend and to resume production infinitely many times subject to a time lag after each startup decision. We contribute to the literature by allowing the firm to determine its level of installed capacity in conjunction with its optimal investment timing. We find that an increase in the length of the time lag results in an increase in the optimal capacity level. Capacity optimization also interacts with the length of the time lag to affect investment timing and the triggers to suspend and resume production, thereby weakening the result about hysteresis from a standard real options model. Under the assumption of a fixed level of capacity, a longer lag speeds up the decision to resume operations due to a positive upside to the revenue but delays the suspension of operations. By contrast, with capacity optimization, a longer time lag results in a larger capacity choice, which can indirectly delay the investment decision and the timing to resume operations. This indirect effect dominates when the level of market uncertainty is low and the time lag is initially small. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:660 / 672
页数:13
相关论文
共 23 条
[1]   The strategic perils of delayed differentiation [J].
Anand, Krishnan S. ;
Girotra, Karan .
MANAGEMENT SCIENCE, 2007, 53 (05) :697-712
[2]  
BarIlan A, 1996, AM ECON REV, V86, P610
[3]   Dedicated vs product flexible production technology: Strategic capacity investment choice [J].
Boonman, H. J. ;
Hagspiel, V. ;
Kort, P. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (01) :141-152
[4]  
Boonman H. J., 2014, WORKING PAPER
[5]   EVALUATING NATURAL-RESOURCE INVESTMENTS [J].
BRENNAN, MJ ;
SCHWARTZ, ES .
JOURNAL OF BUSINESS, 1985, 58 (02) :135-157
[6]   Resource flexibility with responsive pricing [J].
Chod, J ;
Rudi, N .
OPERATIONS RESEARCH, 2005, 53 (03) :532-548
[7]  
Chronopoulos M., 2016, EUR J OPER RES, V256, P543
[8]   When is it better to wait for a new version? Optimal replacement of an emerging technology under uncertainty [J].
Chronopoulos, Michail ;
Siddiqui, Afzal .
ANNALS OF OPERATIONS RESEARCH, 2015, 235 (01) :177-201
[9]   ENTRY AND EXIT DECISION PROBLEM WITH IMPLEMENTATION DELAY [J].
Costeniuc, Marius ;
Schnetzer, Michaela ;
Taschini, Luca .
JOURNAL OF APPLIED PROBABILITY, 2008, 45 (04) :1039-1059
[10]   Investment and capacity choice under uncertain demand [J].
Dangl, T .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 117 (03) :415-428