How does risk analysis add value in the forecasting of oil production?

被引:0
作者
Al-Harthy, Mansoor H. [1 ]
机构
[1] Sultan Qaboos Univ, Petr & Chem Engn Dept, Muscat, Oman
关键词
risk analysis; oil production; decision under uncertainty; performance forecasting; DECISION;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
One of the challenges faced by oil companies is the ability to predict oil production from its fields when faced with uncertainties. The objective of this article is to show how risk analysis can add value to production forecasting. A real case study shows variations in the worst and best production of the company were between 40,000 to 50,000 barrels per day, and the variance between P10 and P90 was approximately 8,000 barrels per day. The results showed that there was only a 53% chance of meeting the company's target of 270,000 barrels per day in the first year. The major uncertainty factors were dynamically captured, and the chances of production meeting certain targets were quantified in probabilities. These results can only be achieved by applying risk analysis to production Forecasting. [Received: April 25, 2011; Accepted: June 27, 2011]
引用
收藏
页码:335 / 355
页数:21
相关论文
共 12 条
[1]   Systems approach vs. decision-tree analysis: An offshore development decision [J].
Al-Harthy, M. ;
Khurana, A. .
PETROLEUM SCIENCE AND TECHNOLOGY, 2007, 25 (08) :1053-1064
[2]  
Al-Harthy Mansoor H., 2010, International Journal of Sustainable Society, V2, P393
[3]   NUMBER OF DEVELOPMENT WELLS: A DECISION UNDER UNCERTAINTY [J].
Al-Harthy, Mansoor H. .
ENGINEERING ECONOMIST, 2010, 55 (04) :328-349
[4]   ANALYSIS OF DECLINE CURVES [J].
ARPS, JJ .
TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1945, 160 :228-247
[5]  
Behrenbruch P., 1985, 13982 SPE
[6]  
Johannessen L., 1994, SPE EUR PROD OP C EX
[7]  
Otis RM, 1997, AAPG BULL, V81, P1087
[8]  
@RiskTM, 2010, RISK
[9]  
Salomao M.C., 2001, SPE LAT AM CAR PETR
[10]  
Spencer J.A., 1998, SPE ANN TECHN C EXH