A joint spare part and maintenance inspection optimisation model using the Delay-Time concept

被引:71
|
作者
Wang, Wenbin [1 ]
机构
[1] Univ Sci & Technol Beijing, Dongling Sch Econ & Management, Beijing, Peoples R China
关键词
Spare part; Inspection; Delay-Time; Optimisation; Renewal; Replacement; Maintenance; ITEM INVENTORY SYSTEM; OF-N SYSTEMS; PROVISIONING POLICY; BLOCK-REPLACEMENT; AGE REPLACEMENT; REPAIR CAPACITY; SIMULATION; DEMAND; LEVEL;
D O I
10.1016/j.ress.2011.07.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Spare parts and maintenance are closely related logistics activities where maintenance generates the need for spare parts. When preventive maintenance is present, it may need more spare parts at one time because of the planned preventive maintenance activities. This paper considers the joint optimisation of three decision variables, e.g., the ordering quantity, ordering interval and inspection interval. The model is constructed using the well-known Delay-Time concept where the failure process is divided into a two-stage process. The objective function is the long run expected cost per unit time in terms of the three decision variables to be optimised. Here we use a block-based inspection policy where all components are inspected at the same time regardless of the ages of the components. This creates a situation that the time to failure since the immediate previous inspection is random and has to be modelled by a distribution. This time is called the forward time and a limiting but closed form of such distribution is obtained. We develop an algorithm for the optimal solution of the decision process using a combination of analytical and enumeration approaches. The model is demonstrated by a numerical example. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1535 / 1541
页数:7
相关论文
共 50 条
  • [1] Multi-objective optimization model for spare parts maintenance based on delay-time theory
    Yang J.
    Han M.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2019, 41 (08): : 1903 - 1912
  • [2] INSPECTION INTERVAL FOR MAXIMUM FUTURE RELIABILITY USING THE DELAY-TIME MODEL
    CERONE, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 68 (02) : 236 - 250
  • [3] Maintenance Scheduling for HV Cable Based on the Delay-time Concept
    Yuan J.
    Zhou C.
    Zhou W.
    Liao Y.
    Wei Y.
    Liu H.
    Gaodianya Jishu/High Voltage Engineering, 2021, 47 (05): : 1640 - 1648
  • [4] Delay-time inspection model with dimensioning maintenance teams: A study of a company leasing construction equipment
    Lopes, Rodrigo S.
    Cavalcante, Cristiano A. V.
    Alencar, Marcelo H.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 88 : 341 - 349
  • [5] DEVELOPMENT AND SENSITIVITY ANALYSIS OF A TECHNICAL OBJECT INSPECTION MODEL BASED ON THE DELAY-TIME CONCEPT USE
    Jodejko-Pietruczuk, Anna
    Werbinska-Wojciechowska, Sylwia
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2017, 19 (03): : 403 - 412
  • [7] Modelling fallible maintenance processes using the delay-time concept and probabilistic stochastic filtering techniques
    Carr, M.
    Christer, A. H.
    Wang, W.
    Proceedings of the First International Conference on Maintenance Engineering, 2006, : 626 - 634
  • [8] Maintenance Optimization of a 2-Component Swappable Series System Using the Delay-Time Concept
    Wang, Liying
    Zhang, Wenhua
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [9] The Delay-time Maintenance Optimization Model with Two Failure Modes
    Zhu Lei
    Zuo Hong-fu
    MANAGEMENT, MANUFACTURING AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 452-453 : 190 - 194
  • [10] A stochastic model for joint spare parts inventory and planned maintenance optimisation
    Wang, Wenbin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 216 (01) : 127 - 139