Batch process schedule optimization under parameter volatility

被引:5
作者
Lee, YG [1 ]
Malone, MF [1 ]
机构
[1] Univ Massachusetts, Dept Chem Engn, Amherst, MA 01003 USA
关键词
D O I
10.1080/00207540010010235
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A general strategy to treat the uncertainties in parameters of batch process scheduling has been developed. The strategy consists of three algorithms: flexible planning, flexible scheduling and reactive schedule adapt at ion. In this paper, we introduce the flexible scheduling and the reactive schedule adaptation algorithms. The flexible scheduling algorithm is based on both a Monte Carlo simulation and a simulated annealing. It can deal with multiple uncertain parameters and any type of probability density function for the uncertain parameter. We seek the flexible schedule that maximizes the expected profit, including net present values of products less raw material and processing costs, as well as due date penalties, inventory costs and setup costs. In reality, the values of uncertain parameters always change after the batch process schedule and plan are set up. Since the flexible schedule has periods of free time that can be used to accommodate uncertainties during the actual production, the reactive schedule adaptation algorithm can modify the flexible schedule in response to any change in an uncertain parameter with little or no penalty. This algorithm finds a new optimal or suboptimal solution under the new condition by using a combination of different local search methods, which are described.
引用
收藏
页码:603 / 623
页数:21
相关论文
共 27 条
[1]  
AARTS EHL, 1985, P IEEE INT C COMPUTE, P206
[2]  
ARMSTRONG WS, 1983, CHEM ENG PROG, V79, P56
[3]  
BASHAN Y, 1987, CHEM ENG-NEW YORK, V94, P123
[4]  
Binder K., 1988, MONTE CARLO SIMULATI
[5]   MINIMIZING THE EFFECTS OF BATCH PROCESS VARIABILITY USING ONLINE SCHEDULE MODIFICATION [J].
COTT, BJ ;
MACCHIETTO, S .
COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) :105-113
[6]   QUANTITATIVE OVERDESIGN OF CHEMICAL PROCESSES [J].
FREEMAN, RA ;
GADDY, JL .
AICHE JOURNAL, 1975, 21 (03) :436-440
[7]   OPTIMUM DESIGN OF MULTIPURPOSE CHEMICAL-PLANTS [J].
GROSSMANN, IE ;
SARGENT, RWH .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1979, 18 (02) :343-348
[8]   DECOMPOSITION STRATEGY FOR DESIGNING FLEXIBLE CHEMICAL-PLANTS [J].
GROSSMANN, IE ;
HALEMANE, KP .
AICHE JOURNAL, 1982, 28 (04) :686-694
[9]   OPTIMIZATION STRATEGIES FOR FLEXIBLE CHEMICAL PROCESSES [J].
GROSSMANN, IE ;
HALEMANE, KP ;
SWANEY, RE .
COMPUTERS & CHEMICAL ENGINEERING, 1983, 7 (04) :439-462
[10]   OPTIMAL PROCESS DESIGN UNDER UNCERTAINTY [J].
HALEMANE, KP ;
GROSSMANN, IE .
AICHE JOURNAL, 1983, 29 (03) :425-433