PROBLEMS IN PREPARATION OF SPECIAL CONSTRUCTION PROGRAM FOR HAZARDOUS FORMWORK AND SCAFFOLD SYSTEM

被引:0
作者
Min, Long [1 ]
机构
[1] Bi Jie Univ, Bi Jie 551700, Gui Zhou, Peoples R China
来源
2011 3RD INTERNATIONAL CONFERENCE ON COMPUTER TECHNOLOGY AND DEVELOPMENT (ICCTD 2011), VOL 2 | 2012年
关键词
Formwork; Scaffold System; Special Construction Program;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Formwork and scaffold system are particularly in the majority of hazardous sub-part and sub-tern projects. In the process of expert evaluation, many problems are found in the special construction programs established by the construction units, such as incomplete establishment contents of special program, calculation errors, etc. For these problems, the corresponding solutions are presented.
引用
收藏
页码:271 / 275
页数:5
相关论文
共 3 条
[1]  
[Anonymous], JGJ1302001
[2]  
[Anonymous], JGJ1622008
[3]  
WANG Yu-long, HDB STEEL TUBULAR SC