Automated progress monitoring system for linear infrastructure projects using satellite remote sensing

被引:36
作者
Behnam, Ali [1 ,4 ]
Wickramasinghe, Darshana Charitha [2 ]
Ghaffar, Moataz Ahmed Abdel [2 ]
Tuong Thuy Vu [2 ]
Tang, Yu Hoe [1 ]
Isa, Hazril Bin Md [3 ]
机构
[1] Univ Nottingham Malaysia Campus, Dept Civil Engn, Semenyih 43500, Malaysia
[2] Univ Nottingham Malaysia Campus, Sch Geog, Semenyih 43500, Malaysia
[3] Syarikat Prasarana Negara Berhad, Dept Res & Dev, Kuala Lumpur 50470, Malaysia
[4] Swinburne Univ Technol, POB 218, Hawthorn, Vic 3122, Australia
关键词
Satellite images; Remote sensing; Horizontal infrastructure; Feature recognition; Web-based interface; Open source; CONSTRUCTION; INFORMATION; IMAGERY;
D O I
10.1016/j.autcon.2016.05.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents an automated system for progress monitoring of key repetitive construction activities in linear infrastructure projects. The prototype model utilizes several feature recognition techniques to automatically measure the actual progress of different locations in the project using high resolution satellite remote sensing images. A spatiotemporal database integrated with a baseline schedule automatically provides the location-based progress data. The system uses location-based charts and a progress map to generate and display the progress reports on a web-based open source interface. The prototype model was applied to an elevated railway project The main benefits of the proposed system include the automated measurement, enhanced visualization and documentation of planned/actual progress in large linear projects. The system can enhance the process of communication on deviations and construction efficiency between project decision makers through a web-based monitoring interface. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:114 / 127
页数:14
相关论文
共 40 条
[1]   Time-lapse digital photography applied to project management [J].
Abed, J ;
Arditi, D .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (06) :530-535
[2]  
Aggarwal S., 2003, P SAT REM SENS GIS A, P423
[3]   FORMAL DEVELOPMENT OF LINE-OF-BALANCE TECHNIQUE [J].
ALSARRAJ, ZM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04) :689-704
[4]  
Arayici Y., 2004, EWORK EBUSINESS ARCH
[5]  
Arditi D., 2002, Construction Management and Economics, V20, P353, DOI DOI 10.1080/01446190210131647
[6]   Geographic Object-Based Image Analysis - Towards a new paradigm [J].
Blaschke, Thomas ;
Hay, Geoffrey J. ;
Kelly, Maggi ;
Lang, Stefan ;
Hofmann, Peter ;
Addink, Elisabeth ;
Feitosa, Raul Queiroz ;
van der Meer, Freek ;
van der Werff, Harald ;
van Coillie, Frieke ;
Tiede, Dirk .
ISPRS JOURNAL OF PHOTOGRAMMETRY AND REMOTE SENSING, 2014, 87 :180-191
[7]   Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction [J].
Bosche, Frederic .
ADVANCED ENGINEERING INFORMATICS, 2010, 24 (01) :107-118
[8]  
CARR RI, 1974, J CONSTRUCT DIV-ASCE, V100, P403
[9]  
Chandrakala M., 2013, INT J ADV RES COMPUT, V3, P178
[10]   APPLICATION OF LINEAR SCHEDULING [J].
CHRZANOWSKI, EN ;
JOHNSTON, DW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1986, 112 (04) :476-491