Lean Based Maturity Framework Integrating Value, BIM and Big Data Analytics: Evidence from AEC Industry

被引:26
作者
Demirdogen, Gokhan [1 ]
Diren, Nihan Sena [2 ]
Aladag, Hande [1 ]
Isik, Zeynep [1 ]
机构
[1] Yildiz Tech Univ, Dept Civil Engn, Davutpasa Caddesi, TR-34220 Istanbul, Turkey
[2] Tech Univ Berlin, Dept Civil Syst Engn, D-13355 Berlin, Germany
关键词
lean management; value engineering; building information modeling; big data analytic; CONSTRUCTION-INDUSTRY; MANAGEMENT; IMPLEMENTATION; DESIGN; SUSTAINABILITY; ARCHITECTURE; PROJECTS; SITE;
D O I
10.3390/su131810029
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The construction industry is considered as one of the least productive, highest energy consuming, and least digitized industries. The Lean Management (LM) philosophy became a significant way for eliminating non-value-added activities and wastes during a building's lifecycle. However, studies have shown that philosophies are not efficient by themselves to solve the issues of the construction industry. They need to be supported with the appropriate technologies and tools. Therefore, the integrated use of Building Information Modelling (BIM) with LM or Value Engineering (VE) were proposed in the literature. Nonetheless, it was also seen that BIM can provide more insights and improvements when BIM is integrated with data analysis tools to analyze BIM data. In the literature, the synergies between these concepts are generally addressed pairwise, and there is no comprehensive framework which identifies their relationships. Therefore, this study aims to develop a maturity framework that facilitates the adoption of LM, VE, BIM, and Big Data Analytic (BDA) concepts to address long-standing productivity and digitalization issues in the Architecture, Engineering, and Construction (AEC) industry. Design Science Research (DSR) methodology and its three-cycle view (relevance, rigor, and design cycle) were applied to build the proposed maturity framework. Two interviews were performed to identify and observe research problem in relevance cycle. In the rigor cycle, a comprehensive literature review was performed to create a base for the development of the maturity framework. In addition to the developed base of the framework, lean processes were added to this cycle. In the design cycle, the developed framework was evaluated and validated by five experts through face-to-face interviews. The importance of employer's requirements to adopt the proposed methodologies, the negative impact of change orders, the importance of pre-construction phases to facilitate value creation and waste elimination, and the usage of common data environment with BIM were identified as the prominent application and adaptation issues.
引用
收藏
页数:27
相关论文
共 94 条
[1]   Barriers to the adoption of value management in developing countries [J].
Aghimien, Douglas Omoregie ;
Oke, Ayodeji Emmanuel ;
Aigbavboa, Clinton Ohis .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (07) :818-834
[2]  
Ahmed S., 2019, SMART SUSTAIN BUILT
[3]  
Ahuja Ritu, 2017, International Journal of Sustainable Built Environment, V6, P69, DOI 10.1016/j.ijsbe.2016.10.006
[4]   Developing organizational capabilities to deliver lean and green project outcomes using BIM [J].
Ahuja, Ritu ;
Sawhney, Anil ;
Arif, Mohammed .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (10) :1255-1276
[5]   Using social network theory and simulation to compare traditional versus BIM-lean practice for design error management [J].
Al Hattab, Malak ;
Hamzeh, Farook .
AUTOMATION IN CONSTRUCTION, 2015, 52 :59-69
[6]   BIM/MR-Lean Construction Project Delivery Management System [J].
Alizadehsalehi, Sepehr ;
Hadavi, Ahmad ;
Huang, Joseph Chuenhuei .
2019 IEEE TECHNOLOGY & ENGINEERING MANAGEMENT CONFERENCE (TEMSCON), 2019,
[7]   Factors for effective BIM governance [J].
Alreshidi, Eissa ;
Mourshed, Monjur ;
Rezgui, Yacine .
JOURNAL OF BUILDING ENGINEERING, 2017, 10 :89-101
[8]   Exploring lean construction practice, research, and education [J].
Alves, Thais ;
Milberg, Colin ;
Walsh, Kenneth .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (05) :512-+
[9]   Investigating conflicts of expert contractors using the last planner system in building information modeling process [J].
Amany, Adib ;
Taghizade, Katayoon ;
Noorzai, Esmatullah .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (06) :1381-1402
[10]   Technology adoption in the BIM implementation for lean architectural practice [J].
Arayici, Y. ;
Coates, P. ;
Koskela, L. ;
Kagioglou, M. ;
Usher, C. ;
O'Reilly, K. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (02) :189-195